Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.4 LAccepted-AOC A 15 FLAT NO 02 GROUND FLOOR NAVJEVAN CHS SECTOR 15 AIROLI NAVI MUMBAI 400 708 | NAVI MUMBAI | THANE | MAHARASHTRA | 400708 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹78.4 L+₹5.9 L (8.18%)Rejected-Finance ROMA BANJARA TANDA CHS BLDG NO 1 ROOM NO 507 607 MANKHURD W MUMBAI 400043 | MUMBAI | MUMBAI | MAHARASHTRA | 400043 | L2 | Rejected-Finance Being L2 |
| Sl No | Description | Qty | Unit | M/S A.M CONSTRUCTIONS L2 | Jai Malhar Constrction L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge
From 0.00 to 1.50 m depth from Average Ground Level | 60 | CuM | 700 ₹42,000 | 295 ₹17,700 Lowest |
| 2.00 | Lead charges for lead exceeding 2 KM but not exceeding 3 KM, by mechanical transport including loading, unloading, stacking / levelling etc.
Soil
Note: The rates in respect of above item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of Soils from the corresponding stack/truck measurements. | 30 | CuM | 550 ₹16,500 | 290 ₹8,700 Lowest |
| 3.00 | Lead charges for lead Exceeding 2 KM but not exceeding 3 KM, by mechanical transport including loading, unloading, stacking / levelling etc.
Debris Beyond 2 Km but up to and including 3 km
Note: The rates in respect of above item are applicable for the NET Quantities arrived at after making deductions for voids @ 30% in respect of debris from the corresponding stack/truck measurements. | 50 | CuM | 580 ₹29,000 | 295 ₹14,750 Lowest |
| 4.00 | Providing and laying in position cement concrete of 1:3:6 (1 cement, 3 crushed sand, 6 graded stone aggregate of maximum size 20 mm) including consolidation, finishing, curing etc. complete as per specificationsand drawings but excluding the cost of Form work shuttering, centering Complete at all levels | 25 | CuM | 7,000 ₹1,75,000 Lowest | 7,000 ₹1,75,000 Lowest |
| 5.00 | Providing and laying in position Reinforced Cement Concrete (RCC) of grade M-30 using 20mm maximum size aggregates and crushed sand of approved quality including admixtures of approved brand and quality (plasticiser or super plasticiser) if required, including weigh batching, mechanical mixing, transporting, placing, vibrating, consolidation, finishing, curing etc. complete but excluding the cost of centering, shuttering and reinforcement complete as per specifications up to Plinth Level.
Note: i) For all the items, of item no. - in view of limit on water-cement ratio for durability requirements, concrete admixtures (Naphthalene / Melamine based superplasticizers) can be used after taking prior approval of Engineer-in-Charge and the rates quoted for these items shall be inclusive of the cost of admixtures, trial mixes, testing (at site & at approved labs), etc. complete.
ii) All projections, fins etc. in the concrete surface formed at the joints in the formwork should be ground & flush and finished at no extra cost. | 10 | CuM | 9,000 ₹90,000 | 7,500 ₹75,000 Lowest |
| 6.00 | Providing and laying in position Reinforced Cement Concrete (RCC) of grade M-30 using 20mm maximum size aggregates and crushed sand of approved quality including admixtures of approved brand and quality (plasticiser or super plasticiser) if required, including weigh batching, mechanical mixing, transporting, placing, vibrating, consolidation, finishing, curing etc. complete but excluding the cost of centering, shuttering and reinforcement complete as per specifications in super structure up to 20.00 metre height.
Note: i) For all the items, of item no. - in view of limit on water-cement ratio for durability requirements, concrete admixtures (Naphthalene / Melamine based superplasticizers) can be used after taking prior approval of Engineer-in-Charge and the rates quoted for these items shall be inclusive of the cost of admixtures, trial mixes, testing (at site & at approved labs), etc. complete.
ii) All projections, fins etc. in the concrete surface formed at the joints in the formwork should be ground & flush and finished at no extra cost. | 10 | CuM | 12,000 ₹1,20,000 | 7,750 ₹77,500 Lowest |
| 7.00 | Providing , centering ,shuttering Form work using PVC film faced plywood to get a neat form finish surface for all types of structures including necessary strutting, proping, staging, supports etc and deshuttering the same after the specified time all as per drawings, specifications and as directed by the Engineer-in-charge at all levels.
For Sub Structure | 30 | SqM | 700 ₹21,000 Lowest | 700 ₹21,000 Lowest |
| 8.00 | Providing , centering ,shuttering Form work using PVC film faced plywood to get a neat form finish surface for all types of structures including necessary strutting, proping, staging, supports etc and deshuttering the same after the specified time all as per drawings, specifications and as directed by the Engineer-in-charge at all levels.For Super Structure | 100 | SqM | 750 ₹75,000 Lowest | 750 ₹75,000 Lowest |
| 9.00 | Extra for RCC Using Ready Mix Concrete from outside project area including transporting and pumping from approved batching plants . | 20 | CuM | 1,500 ₹30,000 Lowest | 2,000 ₹40,000 |
| 10.00 | Providing Reinforcement Steel for reinforced cement concrete at all levels including supplying, preparation of bar bending schedules, cutting, bending, transporting, fixing, tieing in position with PVC coated with 1.6 mm dia soft drawn annealed G.I binding wire, all labour charges, cost of cover blocks in specified grade of concrete etc. etc. complete including cost of binding wire, complete as per specifications and drawings. - Steel supplied by the contractor. - Using TMT bars of specified grades all dia bars. TMT bars to be supplied by the contractor manufactured by approved brands Confirming to IS:1786. | 0.5 | MT | 1,10,000 ₹55,000 | 90,000 ₹45,000 Lowest |
Tender Value
₹68.6 L
EMD Value
₹1.6 L
Closing Date
16 Sept 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer
CED, BARC, Trombay, Mumbai 400085
Renovation of toilets of RUMP and other buildings at South site, BARC, Trombay, Mumbai.
2025_BARC_875158_1
BARC/CED/ET/28/2025-2026 Dated 28/08/2025
Open Tender
Civil Works
Item Rate
455 days
South site, BARC, Trombay, Mumbai.
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.6 L
30 Dec 2025
29 Aug 2025
19 Sept 2025
29 Aug 2025
16 Sept 2025
2 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .