Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-Finance | ₹2.4 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹2.4 Cr+₹3.3 L (1.40%)Accepted-Finance | ₹2.4 Cr+₹3.3 L (1.40%) | L2 | Accepted-Finance Accepted |
| 3 | L2₹2.4 Cr+₹3.3 L (1.40%)Accepted-Finance | ₹2.4 Cr+₹3.3 L (1.40%) | L2 | Accepted-Finance Accepted |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Dacument Incomplete |
Tender Value
₹2.4 Cr
EMD Value
₹1.5 L
Closing Date
20 Aug 2026, 3:00 pmClosed
EE Works ZP Nagpur
EE Works ZP Nagpur
CONSTRUCTION OF N.H. 44 TO PIPARIYA ROAD KM 4/250 TO 6/950 O.D.R. 114 AND CONSTRUCTION OF PIPARIYA TO SILLARI ROAD KM 6/950 TO 8/460 O.D.R. 114 TAH.- RAMTEK, DIST.- NAGPUR
2026_NAGPU_1327947_1
NAGPU/WORKS/Tender No 04 Open/2026-27(1st Call)
Open Tender
Civil Works
Percentage
Works
Please refer tendor doqument
2 documents required · 2 mandatory
₹1,180
₹1.5 L
3 Sept 2026
13 Aug 2026
21 Aug 2026
13 Aug 2026
20 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Construction of NH 44 to Pipariya Road KM 4/250 to 6/950 ODR 114 and Construction of Pipariya to Sillari Road KM 6/950 to 8/460 ODR 114 Taluka Ramtek | - | Nos | 2,36,39,607 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.74 MB
Tendernotice_2.pdf
PDF • 2.74 MB
BOQ_2273839.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .