| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.8 LAccepted-AOC RUDRANAGAR P S SAGAR 24 PARGANAS SOUTH | L1 | Accepted-AOC satishfied | |
| 2 | L2₹40.8 L+₹99,061 (2.49%)Rejected-Finance 133 GARFA MAIN ROAD KOLKATA 700 078 | KOLKATA | KOLKATA | WEST BENGAL | 700078 | L2 | Rejected-Finance Bidder is not L1 | |
| 3 | L3₹40.8 L+₹99,645 (2.50%)Rejected-Finance | L3 | Rejected-Finance Bidder is not L1 | |
| 4 | L4₹42.9 L+₹3.1 L (7.74%)Rejected-Finance | L4 | Rejected-Finance Bidder is not L1 | |
| 5 | L5₹43.0 L+₹3.1 L (7.82%)Rejected-Finance | L5 | Rejected-Finance Bidder is not L1 |
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
27 Aug 2024, 3:00 pmClosed
EE I CKHED
P12 CIT Road 1st floor Kol 14
Annual Preventive and Breakdown Maintenance of entire Electrical Installations for the Hospital Campus College Campus and Different Hostel Buildings under the Jurisdiction of Calcutta National Medical College and Hospital
2024_WBPWD_731277_1
WBPWD/EE-I/CKHED/eNIT-17/24-25
Open Tender
ELECTRICAL WORKS ORG
Item Rate
365 days
CNMCH
AS PER NIT
4 documents required · 4 mandatory
₹1.0 L
central kolkata health electrical division
8 Apr 2025
9 Aug 2024
29 Aug 2024
9 Aug 2024
27 Aug 2024
16 Aug 2024
14 Aug 2024
Amount
Day to day round the clock maintenance of Electrical Installation of both non-residential & residential buildings/floors/blocks incl. 11KV Sub-station, compound illumination and other ancilliary electrical utilities/gadgets etc. installed within the Hospital Campus, College Campus and 4 number different Hostel building of Calcutta National Medical College & Hospital as per prescribed annexure in Part A (SCOPE OF WORK), Part B (TIME SCHEDULE WITH NAME & ALLOCATION OF THE BUILDINGS WITHIN MAINTENANCE COVERAGE) and Part C (GENERAL TERMS & CONDITIONS OF MAINTENANCE) by engaging following different catagory of personnel. [ 3 shift per day in weekdays as well as in all Saturday, Sunday & Holidays]
Deputing one Highly Skilled Electrician having ITI Certificate and 11 KV License with Workman Permit i(b), ii, iii, iv, v, vi (a), vii (a) & viii (a) for one shift per day
Deputing a total of Nine (9) Skilled electricians to work round the clock per day in different shift arrangements as per Annexure in Part B, Point 3.00
Deputing a total of Eleven (11) Un Skilled helpers to work round the clock per day in different shift arrangements as per Annexure in Part B, Point 3.00
Note: 1.In the absence of a leap year, the standard year consists of 365 days. Any potential extensions can be seamlessly adjusted based on the calendar year. 2.Shifts calculation. (Duration-1 Shift X365 dayes=365 Shifts) (Duration-9 ShiftsX365dayes =3285 Shifts) (Duration-11 ShiftsX365dayes =4015 Shifts) 3. The provided Rate per Shift should include a comprehensive set of expenses, encompassing not only the service itself but also the provision of minor maintenance materials. These minor maintenance materials include items such as nuts, bolts, washers, Spring washers, sockets, split pins, jam nuts, fastnuts, lubricants, anti corrosive paste, cloth, sand paper, WD-40, insulation tapes, spare cable with Al & Cu sockets of different sizes and types and other similar consumables that may be necessary for the maintenance work. Additionally, this rate should also includes the rental cost of a sufficient quantity of maintenance tools, ensuring that at least three sets of each tool types are made available at all time at the site. These maintenance tools may include items like heavy duty drill machines with drill bits, crimping machine, spanners, allen keys, pliers, Stripper, clippers, testers, Digital multimeters, IR Thermometer, 500V Meggar, Earth Tester, screwdriver sets, allen key set, blower motor and so on. Furthermore, as part of the all-inclusive package, the rate covers the provision of supply of all log books and register books necessary for record-keeping and documentation during the maintenance work.
It's essential to highlight that major materials such as tube lights, fans, switches, sockets, wires/ cables and similar items are not encompassed within these rates. These major materials are typically provided by the department, and their cost is not included in the all-inclusive Rate per Shift.
Rate should be quoted including of all taxes, duty and cess
Prava Enterprise
NAYEE DISHA PROJECTS
BANERJEE CONCERN
KANJILAL and SONS
CHAKRABORTY ENTERPRISE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .