| 1 | L1₹38.8 LAdmitted-Finance ASSAM AS | KAMRUP | ASSAM | 781030 | ₹38.8 L | L1 | Admitted-Finance |
| 2 | L2₹42.5 LAdmitted-Finance PAKHRIGURI KOKRAJHAR | DHUBRI | ASSAM | 783331 | ₹42.5 L | L2 | Admitted-Finance |
| 3 | L3₹44.8 LAdmitted-Finance VILL SOUTH SONAPUR P O PATGAON P S SERFANGURI DIST KOKRAJHAR BTC ASSAM PIN 783346 | KOKRAJHAR | KOKRAJHAR | ASSAM | 783346 | ₹44.8 L | L3 | Admitted-Finance |
| 4 | L4₹44.8 LAdmitted-Finance VILL TILAPARA P O RANGALIKHATA P S DIST KOKRAJHAR BTC ASSAM | ₹44.8 L | L4 | Admitted-Finance |
| 5 | L5₹44.8 LAdmitted-Finance C O LT MAAHANTA NARZARY W NO 5 TENGAPARA P O P S KOKRAJHAR DIST KOKRAJHAR BTC ASSAM PIN 783370 | KOKRAJHAR | KOKRAJHAR | ASSAM | 783370 | ₹44.8 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SWRANG NARZARY L4 | DHARAMSING NARZARY L5 | Jamidar Narzary L1 | BISTI MUSHAHARY L3 | ARJUN NARZARY L2 | DILIP KUMAR BRAHMA L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00… | |||||||||
| 1.01 | Item No.1. 2.2(i) (a) Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 0.08 | Ha. | 55,808.98 ₹4,464.72 | 55,808.98 ₹4,464.72 | 55,800 ₹4,464 | 55,808.98 ₹4,464.72 | 53,018.53 ₹4,241.48 | 56,000 ₹4,480 |
| 1.02 | Item No.2. 3.20 (I) (a) & 11.1 (I) Earth work in excavation of foundation of structures as per drawing and technical specification clause including setting out construction of shoring and bracing deleterious matter, dressing of sides and bottom and backfilling with approved material.
Manual Means (Depth up to 3 m) (Without dewatering).
River bank cutting without dewatering | 144 | Cum | 134.47 ₹19,363.68 | 134.47 ₹19,363.68 | 135 ₹19,440 | 134.47 ₹19,363.68 | 127.74 ₹18,394.56 | 160 ₹23,040 |
| 1.03 | Item No.3. 3.20 (I) (a) & 11.1 (I) Foundation of Boulder revetment with dewatering in Ordinary soil | 979.2 | Cum | 196.35 ₹1.9 L | 196.35 ₹1.9 L | 195 ₹1.9 L | 196.35 ₹1.9 L | 186.53 ₹1.8 L | 250 ₹2.4 L |
| 1.04 | Item No.4. 14.2 Providing and laying of boulder apron laid in wire crates made with 4 mm G.I wire conforming to IS:280 &IS 4826 in 100 mm x 100 mm mesh (woven diagonally) including 10% extra for laps and joints laid with stone boulders weighting not less than 25 Kg each as per drawing and technical specifications Clause 1301. | 1,305.6 | Cum | 2,928.23 ₹38.2 L | 2,928.23 ₹38.2 L | 2,450 ₹32.0 L | 2,928.23 ₹38.2 L | 2,781.81 ₹36.3 L | 3,200 ₹41.8 L |
| 1.05 | Item No. 5. 14.1 Providing and laying boulders apron for bed protection with stone boulders of minimum size and as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and Technical specification Clause 1301. | 115.2 | Cum | 1,959.69 ₹2.3 L | 1,959.69 ₹2.3 L | 2,200 ₹2.5 L | 1,959.69 ₹2.3 L | 1,861.7 ₹2.1 L | 1,960 ₹2.3 L |
| 1.06 | Item No. 6. 16.54 Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment ofland compensation. | 687.75 | Cum | 271.92 ₹1.9 L | 271.92 ₹1.9 L | 270 ₹1.9 L | 271.92 ₹1.9 L | 258.35 ₹1.8 L | 250 ₹1.7 L |
| 1.07 | Item No. 7. 3.12 Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. | 555.44 | Sqm | 24.63 ₹13,680.49 | 30 ₹16,663.20 | 24 ₹13,330.56 | 24 ₹13,330.56 | 23.39 ₹12,991.74 | 25 ₹13,886 |
| 1.08 | Item No.8. R.C.C. Engraved signboard, photo evidence etc. | 1 | No. | 13,088.83 ₹13,088.83 | 13,088.83 ₹13,088.83 | 11,928.94 ₹11,928.94 | 13,088.83 ₹13,088.83 | 12,436.35 ₹12,436.35 | 15,000 ₹15,000 |
Tender Value
₹44.8 L
EMD Value
₹89,575
Closing Date
9 Feb 2026, 2:00 pmClosed
Director of Soil Conservation
O/o The DSC, Bhumi sangrakshan bhanvan, RGB Road, Guwahati -05
Erosion Protection at Nizlaguri Village under RIDF-XXXI
2026_SCD_50305_6
Tender/NIT/Pt-I/2025-26/7296
Open Tender
Civil Works
120 days
Chirang Soil Conservation Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹900
₹89,575
Yes
O/o The DSC, Assam
14 May 2026
17 Jan 2026
9 Feb 2026
20 Jan 2026
9 Feb 2026
22 Jan 2026
22 Jan 2026
Item No.1. 2.2(i) (a) Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Item No.2. 3.20 (I) (a) & 11.1 (I) Earth work in excavation of foundation of structures as per drawing and technical specification clause including setting out construction of shoring and bracing deleterious matter, dressing of sides and bottom and backfilling with approved material. Manual Means (Depth up to 3 m) (Without dewatering). River bank cutting without dewatering
Item No.3. 3.20 (I) (a) & 11.1 (I) Foundation of Boulder revetment with dewatering in Ordinary soil
Item No.4. 14.2 Providing and laying of boulder apron laid in wire crates made with 4 mm G.I wire conforming to IS:280 &IS 4826 in 100 mm x 100 mm mesh (woven diagonally) including 10% extra for laps and joints laid with stone boulders weighting not less than 25 Kg each as per drawing and technical specifications Clause 1301.
Item No. 5. 14.1 Providing and laying boulders apron for bed protection with stone boulders of minimum size and as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and Technical specification Clause 1301.
Item No. 6. 16.54 Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment ofland compensation.
Item No. 7. 3.12 Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309.
Item No.8. R.C.C. Engraved signboard, photo evidence etc.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
ChirangNizlaguri.pdf
Tender Documents • 0.97 MB
BOQ_80148.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid