Loading…
Loading…
Tender Value
₹50.2 L
EMD Value
₹1.0 L
Closing Date
12 Jun 2026, 3:00 pm7d left
CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-02 Ward-84 ke antargat Shastri Nagar Colony Sadiyapur ki kshatigrast sadak sudhar karya.
2026_NNAMC_1155465_8
12.06.2026 work no 22
Open Tender
Civil Works
90 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
AS PER DOCS
₹1.0 L
1 Jun 2026
1 Jun 2026
12 Jun 2026
1 Jun 2026
12 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismentling of existin enchrochment like ramp, platform etc monolethic structure and inding stacking of materials with all complete work
CC/RCC plate form | 7.5 | cum | 936 | ₹7,020 | BI01010001010000000000000515BI0100001097 |
| 2 | Dismentling of existin enchrochment like ramp, platform etc monolethic structure and inding stacking of materials with all complete work
Brick Work | 1.38 | Sqm | 468 | ₹645.84 | - |
| 3 | Earth work cuttin in ordinary soil up to 1.5m lift to 30m with all complete work | 136.15 | cum | 87.3 | ₹11,885.9 | - |
| 4 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 137.6 | cum | 1,654.8 | ₹2,27,700.48 | BI01010001010000000000000515BI0100001107 |
| 5 | Earth work Exavation in foundation as in wet and foul position lead lift &30 m lead with aqll complete work (S.I.No.251) | 33.75 | cum | 160 | ₹5,400 | BI01010001010000000000000515BI0100001135 |
| 6 | PCC 1:3:6 cement sand and 40mm brick ballast and all compelte the work | 3 | Cum | 3,500 | ₹10,500 | BI01010001010000000000000515BI0100001129 |
| 7 | M-150 brick work (1:3) cement sand mortor including all complete work (S.I.No.303) | 12.14 | cum | 5,298 | ₹64,330.97 | BI01010001010000000000000515BI0100001111 |
| 8 | Struck Pointing (1:2) cement sand mortor including all complete work (S.I.No.574) | 17.25 | sqm | 197 | ₹3,398.25 | BI01010001010000000000000515BI0100001109 |
| 9 | 12mm thick plaster cement mortar consisting of 1 part cement and 4 parts of fine sand of 1.25 finerness modulus.SI 574 | 45 | Cum | 171 | ₹7,695 | - |
| 10 | Cement Concrete work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work | 7.5 | Cum | 8,200 | ₹61,500 | BI01010001010000000000000515BI0100001121 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.17 MB
Tendernotice_2.pdf
PDF • 1.49 MB
BOQ_2165116.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid