Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.9 LAccepted-Finance | ₹39.9 L | L1 | Accepted-Finance ACCEPT |
| 2 | L2₹40.3 L+₹39,929.86 (1.00%)Rejected-Finance PLOT NO 126 NEAR RAM MANDIR RAMWADI MALKAPUR DIST BULDHANA | MALKAPUR | BULDHANA | MAHARASHTRA | ₹40.3 L+₹39,929.86 (1.00%) | L2 | Rejected-Finance REJECT |
| 3 | L3₹40.7 L+₹79,859.73 (2.00%)Rejected-Finance | ₹40.7 L+₹79,859.73 (2.00%) | L3 | Rejected-Finance REJECT |
Tender Value
₹39.9 L
EMD Value
₹39,929
Closing Date
22 Jul 2026, 1:00 pmClosed
EE RWS ZP BULDANA
EE RWS ZP BULDANA
KOTHALI 7 VILLAGES R.R.SCHEME TQ. MOTALA RUNNING MAINTANING THE SCHEME
2026_BULDH_1315546_1
E-TENDER NOTICE NO. 12 /2026-27 1 ST CALL
Open Tender
Civil Works
Percentage
365 days
KOTHALI
Please Refer Tender All Document
3 documents required · 3 mandatory
₹1,180
₹39,929
27 Jul 2026
9 Jul 2026
23 Jul 2026
9 Jul 2026
22 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Establishment for Maintaining the scheme | 1 | Cum | 0.01 | ₹0.01 |
| 2 | Commissioning of Kothali & 7 Vill. R.R.W.S. cheme for twelve months including Providing & employing staff including pump operators,filter operators,site supervisor,valvemen for distribution of water to ESR covered under the scheme including the maintenance of jackwell,WTP,sump,filters,overhead tank,R/W rising main excluding rectification of leakages etc.(Rate as per Annexure -1) as directed by Engeineer in charge by engaging required minimum staff as suggested in Annexture B with activities to be done as various components of whole scheme etc., Complete. As Per Annexure B Cost of Job Work For 12 months Rs.3230250/- Hence .3230250/12 months=269188/-per month | 12 | Job Work for 12 Month | 2,69,188 | ₹32,30,256 |
| 3 | Rectification of leakages in pipelines of various dia. & type,Repairing of Pumping machinary,Servicing Panel Board including replacing M.C.B.,Cables,Lugs,Cutouts with electrician charges,Repairing sluice Valves included under the scheme.(As per detailed in subwork no.2) Rs.523088 Hence 523088/12=43591 per month | 12 | Job Work for 12 Month | 43,591 | ₹5,23,092 |
| 4 | Providing & suppling Bleaching Powder grade-1 ISI Mark Etc.complete.As per Chemical Demand,2619 kg/12=218.25 kg/month | - | Kg. | 49.8 | - |
| 5 | Providing & suppling Alum As Per ISI specification Etc.complete. As per Chemical Demand, 7.482 MT./12= 0.624 MT./month | 0.2 | MT | 14,599 | ₹2,905.2 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.37 MB
B1.pdf
Other Document • 4.56 MB
NIT1.pdf
Tender Documents • 2.36 MB
BOQ_2255865.xls
BOQ • 0.28 MB
Coriz1.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .