Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.6 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹24.7 L+₹3.5 L (16.6%)Rejected-Finance | L2 | Rejected-Finance Other than L1 | |
| 3 | L3₹26.8 L+₹5.6 L (26.2%)Rejected-Finance | L3 | Rejected-Finance Other than L1 | |
| 4 | L4₹27.3 L+₹6.1 L (28.5%)Rejected-Finance | L4 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | Ashish Sehgal and Co. L3 | M/S MG GROUP L2 | Laxmi traders L1 | shakti construction L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Taking down steel tubing or removing from site of 15mm bore pipe complete all as specified and directed | 300 | RM | 10 ₹3,000 | 5 ₹1,500 | 2 ₹600 Lowest | 10 ₹3,000 |
| 2.00 | All as per item No 1 here in before but 20mm bore. | 200 | RM | 10 ₹2,000 | 5 ₹1,000 Lowest | 5 ₹1,000 Lowest | 10 ₹2,000 |
| 3.00 | Demolition of brick work built in CM incl all quoins, pillars etc but excl ashlar facings, dressed stone work and precast concrete complete all as specified and directed. | 6 | Cum | 50 ₹300 | 20 ₹120 Lowest | 50 ₹300 | 100 ₹600 |
| 4.00 | Taking down cement plaster of any description on brick or concrete surfaces of walls or ceiling etc incl. raking out joints ,hacking for key and scrubbing down with water upto 4 storeys building complete all as specified and directed | 650 | Sqm | 10 ₹6,500 | 2 ₹1,300 Lowest | 10 ₹6,500 | 8 ₹5,200 |
| 5.00 | M&L for 15 mm thick cement plaster in cement mortar 1:6 on brick surfaces on fair face of brick work and finished even and smooth w/o using extra cement upto 4 storeys building complete all as specified and directed | 450 | Sqm | 60 ₹27,000 | 60 ₹27,000 | 50 ₹22,500 Lowest | 60 ₹27,000 |
| 6.00 | M&L for 5 mm thick cement plaster in cement mortar 1:3 on concrete or brick surface and finished even and smooth without using extra cement as in ceiling complete all as specified and directed | 150 | Sqm | 60 ₹9,000 | 60 ₹9,000 | 50 ₹7,500 Lowest | 55 ₹8,250 |
| 7.00 | M&L for preparation of new surface and applying two coat of white wash on ceiling complete all as specified and directed. | 150 | Sqm | 10 ₹1,500 | 5 ₹750 Lowest | 15 ₹2,250 | 9 ₹1,350 |
| 8.00 | M&L for preparation of newly plastered surfaces of wall and applying two coats of oil emulsion distemper by air less spray machine (Machanical means) complete all as specified and directed | 450 | Sqm | 15 ₹6,750 | 12 ₹5,400 | 35 ₹15,750 | 10 ₹4,500 Lowest |
| 9.00 | M&L brick work with old size sub class B brick straight or curved on plan exc 6 m mean radius in half brick thick wall built in cement mortar in CM 1:4 complete all as specified and directed. | 6 | Sqm | 400 ₹2,400 Lowest | 800 ₹4,800 | 450 ₹2,700 | 400 ₹2,400 Lowest |
| 10.00 | S&F 15mm bore steel water tubing medium grade , galvanized ISI marked with all fittings fixed to wall & ceiling or laid in floors complete all as specified and directed by Engineer-in-charge. | 300 | RM | 80 ₹24,000 | 70 ₹21,000 | 60 ₹18,000 Lowest | 90 ₹27,000 |
Tender Value
₹44 L
EMD Value
₹88,000
Closing Date
6 Oct 2025, 6:00 pmClosed
GE (AF) SUBROTO PARK
GE (AF) Subroto Park, Delhi Cantt Delhi-110010
As described in Bill of quantities
2025_MES_729876_1
GE/SP/TOKEN-20/2025-26
Open Tender
Civil Works
Item Rate
180 days
GE (AF) SUBROTO PARK
As per NIT and tender documents
9 documents required · 9 mandatory
₹500
GE (AF) SUBROTO PARK
₹88,000
Yes
30 Dec 2025
8 Sept 2025
9 Oct 2025
8 Sept 2025
6 Oct 2025
23 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .