Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Fee/PreQual/Technical/Finance | -19.92% | ₹4.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.8 LAdmitted-Fee/PreQual/Technical/Finance | -16.10% | ₹4.8 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.9 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹4.9 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.7 L
EMD Value
₹46,838
Closing Date
30 Jul 2026, 4:00 pmClosed
CHIEF ENGINEER
VARANASI NAGAR NIGAM
WARD NO-42 MARAULI UNTERGAT RAJESH JAYSWAL SE JIYA LAL KE BRALDI TAK INTERLOCKING KA KARY
2026_NNVAR_1169770_13
56A_2026_27
Open Tender
Civil Works
Percentage
90 days
NAGAR NIGAM VARANASI
AS PER TENDER DETAILS
3 documents required · 3 mandatory
₹500
TENDER COAST AC NO.50100642535388
₹46,838
31 Jul 2026
17 Jul 2026
30 Jul 2026
17 Jul 2026
30 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1MADAULI ANTARGAT RAJESH JAISWAL SE JIYA LAL KE BOUNDRY TAK INTERLOCKING KA KARYA | |||||
| 1.01 | EARTHWORK AS IN FILLING IN ORDINARY SOIL/SCRAPPING FOR MAKING SURFACE INCLUDING DISPOSAL UP TO 8KM ETC ALL COMPLETE WORK. | 0.2 | CUM | 310.1 | ₹62.02 |
| 1.02 | SUPPLY AND LAYING OF 22-4-53 MM STONE BALLAST ETC ALL COMPLETE WORK. | - | CUM | 2,857 | - |
| 1.03 | S/F RUBBER MOULDED 80MM THICK ETC ALL COMPLETE WORK. (PLAIN 80%) | - | SQM | 835 | - |
| 1.04 | S/F RUBBER MOULDED 80MM THICK ETC ALL COMPLETE WORK. (COLOURED 20%) | - | SQM | 905 | - |
| 1.05 | P/L OF PCC 1:6:12 WITH C/S AND 40 MM GAUGE BRICK BALLAST ETC ALL COMPLETE WORK. | - | CUM | 4,060 | - |
| 1.06 | M-150 CLASS BRICK WORK 1:4 C/S MORTAR ETC ALL COMPLETE WORK. | 1 | SQM | 5,500 | ₹5,494.5 |
| 1.07 | P/L OF CC 1:2:4 WITH C/S AND 20MM GAUGE STONE GRITT ETC ALL COMPLETE WORK. | - | NOS | 7,100 | - |
| 1.08 | SUPPLY AND LAYING OF CC BLOCK K.C. DRAIN ETC ALL COMPLETE WORK. | - | RMT | 1,340 | - |
| 1.09 | CONSTRUCTION OF GULLYPIT OF 2*2*3 ETC ALL COMPLETE WORK. | - | NOS | 8,757 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
BOQ_2195830.xls
BOQ • 0.32 MB
TD56a.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].