Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC The Bid of the contractor is lowest |
| 2 | L2₹1.5 Cr+₹22.2 L (17.2%)Rejected-AOC | ₹1.5 Cr+₹22.2 L (17.2%) | L2 | Rejected-AOC The Bid of the contractor is higher |
Tender Value
Refer Docs
EMD Value
₹3.3 L
Closing Date
8 Jan 2021, 11:00 amClosed
EE Provl Division PWD B and R SBS Nagar
EE Provl Division PWD B and R SBS Nagar
Construction of High Level Bridge 8.30 M Long drain at RD 21.705 crossing Ludhiana Rahon road including its approaches old diversion and dismantling of old bridge in Distt SBS Nagar
2020_CEPW_57699_1
14 dated 16.12.2020
Open Tender
Civil Works - Bridges
Lump-sum
120 days
Nea village Bharta Kalan
Please refer Tender documents.
21 documents required · 21 mandatory
₹10,000
₹3.3 L
18 Feb 2021
18 Dec 2020
8 Jan 2021
18 Dec 2020
8 Jan 2021
18 Dec 2020
Amount
Construction of H/L Bridge 8.30 M long over drain at RD 21.705 X-ing Ludhiana Rahon road including its approaches, old diversion and dismantling of old bridge in district SBS Nagar (Lumps -sum )
SIDHARTHA CONSTRUCTION CO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .