Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC NEAR BYE PASS 1ST FLOOR SHOP NO 4 GALI NO 1 2 OM NAGAR GOHANA ROAD SONIPAT SONIPAT HARYANA 131001 131001 | SONIPAT | SONIPAT | HARYANA | 131001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.5 L+₹11,760 (3.51%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical 93 BADANPUR JIND 126152 | JIND | JIND | HARYANA | 126152 | - | Not Admitted-Fee/PreQual/Technical Others-Society submitted his concern in written regarding not opening of his bid |
Tender Value
Refer Docs
EMD Value
₹6,680
Closing Date
8 Jun 2023, 5:00 pmClosed
Executive Engineer
Executive Engineer HSVP Division No 1 Rohtak, HSVP Complex, Sec 3 Rohtak
Maintenance of sewerage lines of size 200mm i/d to 600mm i/d including cleaning and desalting, attending day to day complaints of sewerage
2023_HBC_286272_1
301/2023
Open Tender
Civil Works
Item-rate/Agreement basic
180 days
Executive Engineer HSVP Division No. 1
As per approved DNIT/NIT
2 documents required · 2 mandatory
₹250
₹6,680
Yes
19 Feb 2024
30 May 2023
9 Jun 2023
30 May 2023
8 Jun 2023
30 May 2023
Maintenance of complete sewerage system including running and operation of all sewerage line of size from 200 mm i/d to 600 mm i/d including cleaning and desalting of sewer lines. The mtc./job including desalting of sewer line and manholes by manual sewer men or mechanically activity redressed / sort out the day to day complaints grievances to open the blockages of sewerage system taken up by the residents within 24 hours. Including providing all safety equipment’s and consumable items like bamboos, mustered oil, soaps, gumboot, Goggles, Ropes Belt etc. and all other life saving Equipment’s, as per requirement at site of work. Note:-The contractor may keep proper watch & ward with regard to dislocation misplacement, damages and unauthorized use to manholes cover and other infrastructure during the working for the mtc. of sewerage system in the sectors. I) 200mm i/d to 600mm i/d Sector-4(Extn.), Rohtak (For 06 months = 06 x 9.80 = 58.80)
THE RUHIL CO-OPERATIVE LABOUR & CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .