Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22989.0 CrAdmitted-Finance 8 1 B DIAMOND HARBOUR ROAD KOLKATA 700027 | KOLKATA | KOLKATA | WEST BENGAL | 700027 | L1 | Admitted-Finance | |
| 2 | L2₹18565.7 Cr−₹4423.3 Cr (19.2%)Admitted-Finance B 322 B 323 ANSAL CHAMBER I 3 BHIKAJI CAMA PLACE NEW DELHI SOUTH WEST DELHI DELHI 110066 | NEW DELHI | DELHI | 110066 | L2 | Admitted-Finance | |
| 3 | L3₹21782.1 Cr−₹1206.9 Cr (5.25%)Admitted-Finance 3A 8A GROUND FLOOR ROYAL PALMS COMPLEX GOREGAON EAST MUMBAI MAHARASHTRA 400065 | MUMBAI SUBURBAN | MAHARASHTRA | 400065 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Paharpur Cooling Towers Limited L1 | AS Cooling Technologies India Private Limited L2 | Hamon Cooling Systems Private Limited L3 |
|---|---|---|---|---|---|---|
| 1.00COOLING TOWER WORKS Part A (CT-01) | ||||||
| 1.01 | PART A
Cooling Towers -1 having 23 working cells with each cell capacity 4000 m3/hr & Cooling Water Treatment Plant & its associated facilities on lumpsum turnkey basis with single point responsibility including but not limited to Project Management, planning, scheduling, monitoring, design & detailed engineering, Supply including - Procurement services of all equipment/ Materials, including all mechanical, electrical and instrumentation works all material required for fabrication, Chlorine dioxide and Chemical dosing system for cooling water treatment, Third party Inspection, and transportation, receipt, accounting, storing & preservation of materials including all other activities incidental to procurement and supply, Construction including foundation, associated building, General Civil works, Fabrication, Erection and Installation of Tower, Mechanical equipment, Electrical and instrumentation equipment and all owner supplied items as free issue items (if applicable). Testing, Mechanical Completion, Pre- commissioning, Commissioning and conducting Performance Guarantee Test Run, including any balance field engineering; insurances in contractor's scope; all taxes, duties, levies, etc. as per provisions of Bidding Document ; supply of all labour, materials, tools & tackles, providing construction aids and all safety devices for construction, all complete as per Bidding Document and direction of Engineer-in-Charge. including training of Owner’s operating staff for a period of 30 days during trial runs and commissioning, Supply of chemicals and consumables including first fill required for equipment & lubricants required during commissioning, trial runs for 30 days, performance guarantee test run and six months consumption of plant operation after completion of 30 days of trial run post commissioning, and fulfilment of performance guarantee of the Tower on Turnkey basis as per scope of work, P&IDs, drawings, data sheets, standards, specifications etc. including supply of commissioning spares, mandatory spares, spares for start-up / pre-commissioning / commissioning | 1 | LS | 0 ₹1,41,41,27,67,250 | 36,38,483.5 ₹1,08,18,19,64,983.5 Lowest | 0 ₹1,27,10,73,15,050 |
| 2.00COOLING TOWER WORKS Part B (CT-02) | ||||||
| 2.01 | PART B
Cooling Tower- 2 having 15 working cells and 1 Stand-by cell with each cell capacity 4000 m3/hr & Cooling Water Treatment Plant & its associated facilities on lumpsum turnkey basis with single point responsibility including but not limited to Project Management, planning, scheduling, monitoring, design & detailed engineering, Supply including - Procurement services of all equipment/ Materials, including all mechanical, electrical and instrumentation works all material required for fabrication, Chlorine dioxide and Chemical dosing system for cooling water treatment, Third party Inspection, and transportation, receipt, accounting, storing & preservation of materials including all other activities incidental to procurement and supply, Construction including foundation, associated building, General Civil works, Fabrication, Erection and Installation of Tower, Mechanical equipment, Electrical and instrumentation equipment and all owner supplied items as free issue items (if applicable). Testing, Mechanical Completion, Pre- commissioning, Commissioning and conducting Performance Guarantee Test Run, including any balance field engineering; insurances in contractor's scope; all taxes, duties, levies, etc. as per provisions of Bidding Document ; supply of all labour, materials, tools & tackles, providing construction aids and all safety devices for construction, all complete as per Bidding Document and direction of Engineer-in-Charge. including training of Owner’s operating staff for a period of 30 days during trial runs and commissioning, Supply of chemicals and consumables including first fill required for equipment & lubricants required during commissioning, trial runs for 30 days, performance guarantee test run and six months consumption of plant operation after completion of 30 days of trial run post commissioning, and fulfilment of performance guarantee of the Tower on Turnkey basis as per scope of work, P&IDs, drawings, data sheets, standards, specifications etc. including supply of commissioning spares, mandatory spares, spares for start-up / pre-commissioning / commissioning. | 1 | LS | 0 ₹88,47,72,69,500 | 15,97,383 ₹77,47,46,72,883 Lowest | 0 ₹90,71,36,05,700 |
Tender Value
Refer Docs
EMD Value
₹4 Cr
Closing Date
24 Jun 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Mr. Jaydip Purkayastha-GM(SCM)
EIL GURUGRAM
COLLING TOWER PACKAGE (PART A(CT-01) AND PART B (CT-02) FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT (BPREP) OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)
2025_EIL_852321_1
JP/B957-999-PB-T-8003/1006
Open Tender
Miscellaneous Works
Works
630 days
AS PER TENDER DOCUMENT
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹4 Cr
AS PER TENDER DOCUMENT
23 Sept 2025
11 Mar 2025
25 Jun 2025
13 Mar 2025
24 Jun 2025
4 Jun 2025
11 Mar 2025 - 31 Mar 2025
21 Mar 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1COOLING TOWER WORKS Part A (CT-01) | |||||
| 1.01 | PART A
Cooling Towers CT-1 having 21 working cells and 1 Stand-by cell with each cell capacity 4000 m3/hr & Cooling Water Treatment Plant & its associated facilities on lumpsum turnkey basis with single point responsibility including but not limited to Project Management, planning, scheduling, monitoring, design & detailed engineering, Supply including - Procurement services of all equipment/ Materials, including all mechanical, electrical and instrumentation works all material required for fabrication, Third party Inspection, and transportation, receipt, accounting, storing & preservation of materials including all other activities incidental to procurement and supply, Construction including foundation, associated building, General Civil works, Fabrication, Erection and Installation of Tower, Mechanical equipment, Electrical and instrumentation equipment and all owner supplied items as free issue items (if applicable). Testing, Mechanical Completion, Pre- commissioning, Commissioning and conducting Performance Guarantee Test Run, including any balance field engineering; insurances in contractor's scope; all taxes, duties, levies, etc. as per provisions of Bidding Document ; supply of all labour, materials, tools & tackles, providing construction aids and all safety devices for construction, all complete as per Bidding Document and direction of Engineer-in-Charge. including training of Owner’s operating staff for a period of 30 days during trial runs and commissioning, including supply of consumables including first fill required for equipment & lubricants required during commissioning, trial runs for 30 days fulfilment of performance guarantee of the Tower on Turnkey basis as per scope of work, P&IDs, drawings, data sheets, standards, specifications etc. including supply of commissioning spares, mandatory spares, spares for start-up / pre-commissioning / commissioning. | 1 | LS | - | - |
| 2COOLING TOWER WORKS Part B (CT-02) | |||||
| 2.01 | PART B
Cooling Towers CT-2 having 15 working and 1 Stand-by-cell with each cell capacity 4000 m3/hr & Cooling Water Treatment Plant & its associated facilities on lumpsum turnkey basis with single point responsibility including but not limited to Project Management, planning, scheduling, monitoring, design & detailed engineering, Supply including - Procurement services of all equipment/ Materials, including all mechanical, electrical and instrumentation works all material required for fabrication, Third party Inspection, and transportation, receipt, accounting, storing & preservation of materials including all other activities incidental to procurement and supply, Construction including foundation, associated building, General Civil works, Fabrication, Erection and Installation of Tower, Mechanical equipment, Electrical and instrumentation equipment and all owner supplied items as free issue items (if applicable). Testing, Mechanical Completion, Pre- commissioning, Commissioning and conducting Performance Guarantee Test Run, including any balance field engineering; insurances in contractor's scope; all taxes, duties, levies, etc. as per provisions of Bidding Document ; supply of all labour, materials, tools & tackles, providing construction aids and all safety devices for construction, all complete as per Bidding Document and direction of Engineer-in-Charge. including training of Owner’s operating staff for a period of 30 days during trial runs and commissioning including Supply of consumables including first fill required for equipment & lubricants required during commissioning, trial runs for 30 days fulfilment of performance guarantee of the Tower on Turnkey basis as per scope of work, P&IDs, drawings, data sheets, standards, specifications etc. including supply of commissioning spares, mandatory spares, spares for start-up / pre-commissioning / commissioning. | 1 | LS | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
BOQ.xls
BOQ • 5.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .