Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.1 CrAccepted-AOC 17 AKANKSHA BUNGLOW GIRIRAJ SOCIETY BANER ROAD NEAR SKAL NAGAR PUNE 07 DIST PUNE | PUNE | PUNE | MAHARASHTRA | 411007 | ₹45.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹46.8 Cr+₹1.7 Cr (3.86%)Rejected-Finance FLAT NO 202 RAHUL ENCLAVES S NO 116 7 1 PLOT NO A WARJE PUNE 411058 | PUNE | MAHARASHTRA | 411058 | ₹46.8 Cr+₹1.7 Cr (3.86%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected due to non eligibility as per bidding document |
| 4 | Rejected-Technical R 25 RESHIMBAGH UMRED ROAD NAGPUR | NAGPUR | NAGPUR | MAHARASHTRA | 440003 | - | - | Rejected-Technical Rejected due to non eligibility as per bidding document |
| 5 | Rejected-Technical BETUL M P | BETUL | BETUL | MADHYA PRADESH | - | - | Rejected-Technical Rejected due to non eligibility as per bidding document |
Tender Value
₹43.0 Cr
EMD Value
₹23.2 L
Closing Date
16 Aug 2024, 5:00 pmClosed
Superintending Engineer PMGSY Pune Regiuon Pune Ne
Superintending Engineer PMGSY Pune Regiuon Pune New Administrative Building 3rd Floor Near Council Hall Pune
RD SOL A252 Tal Pandharpur and Mangalwedha Dist Solapur Total 6 Work
2024_MMGSY_1060635_18
16/2024-25
Open Tender
Civil Works - Roads
Percentage
730 days
Solapur
Please refer Tender documents.
9 documents required · 9 mandatory
₹29,500
Yes
₹23.2 L
Yes
Superintending Engineer PMGSY Pune Regiuon Pune Ne
14 May 2026
29 Jul 2024
19 Aug 2024
29 Jul 2024
16 Aug 2024
29 Jul 2024
5 Aug 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Mangawedha to Damaji Karkhana road ( ODR-50, TR-12 ) km 0.00 to 8.00 Block - Mangalwedha Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.(SOR ITEM NO. 2.2 ) By Manual Means I) In area of non-thorny jungleBy Mechanical Means | 2.72 | Hectare | 27,857.35 | ₹75,771.99 |
| 1.02 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 1,944 | Cubic Metre | 57.5 | ₹1,11,780 |
| 1.03 | Scarifying Existing Granular surface to a depth of 50 mm and disposal of scarified material with alift up to 3 m and leads up to 1000 m as per technical specification clause 301.4. | 11,550 | Square Metre | 16.6 | ₹1,91,730 |
| 1.04 | Milling of existing bituminous surface to specified depth of bituminous layer including disposal of removed material with all lift and lead upto 1000 m etc complete. Using machine like Writgen (W100) or equivalent | 32,450 | Square Metre | 46.2 | ₹14,99,190 |
| 1.05 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5. As directed by engineer in charge. | 1,166.4 | Cubic Metre | 88 | ₹1,02,643.2 |
| 1.06 | Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with all leads and lifts as per Technical Specification Clause 301.5. As directed by engineer in charge. | 8,480.69 | Cubic Metre | 666.6 | ₹56,53,227.95 |
| 1.07 | Construction of subgrade & earthen shoulders with approved material from borrow pits with all lifts & leads, transporting, spreading, grading to required slope & compacted to meet requirement of Table 300.2 as per Technical Specification 303.1 As directed by engineer in charge. | 5,174.7 | Cubic Metre | 797.4 | ₹41,26,305.78 |
| 1.08 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(SOR ITEM NO. 4.1/A )By mix in Place method | 598 | Cubic Metre | 2,135.05 | ₹12,76,759.9 |
| 1.09 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kilonetwon in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. As directed by engineer in charge. | 1,014 | Cubic Metre | 2,422.05 | ₹24,55,958.7 |
| 1.1 | Construction of dry lean cement concrete sub base over a prepared sub-grade with coarse and fine aggregate (natural sand/ VSI grade finely washed crushed sand) conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, , cement content not to be less than 150 kg/cu.m, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant/ Weigh batch mixer, transported to site with all leads and lifts, laid with a paver with electronic sensor /by suitable means as approved by Engineer-in-charge, compacting with vibratory roller, finishing, curing and including preparation of sub-grade surface if required etc. complete. | 4,774 | Cubic Metre | 3,465.65 | ₹1,65,45,013.1 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_1851630.xls
BOQ • 0.36 MB
149192639.pdf
Tender Documents • 0.42 MB
149192641.html
Tender Documents • 0.06 MB
A_252.rar
Tender Documents • 0.18 MB
SBD_252.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .