Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.6 LAdmitted-Finance | +9.00% | ₹19.6 L | L1 | Admitted-Finance |
| 2 | L2₹19.7 LAdmitted-Finance BLDG NO XI 74 NEAR VALLARAM KULLANGARA TEMPLE KUNHIMANGALAM KOVVAPPURAM PO KANNUR DIST KERALA 670309 | KANNUR | KERALA | 670309 | +9.66% | ₹19.7 L | L2 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
18 Apr 2026, 11:00 amClosed
SENIOR MANAGER
WCM DEPARTMENT OF BHEL BAP RANIPET 632406
Structural maintenance works in BHEL Township for one year period 2026_27
2026_BHEL_60057_1
975526002E
Open Tender
Civil Works
365 days
BHEL BAP RANIPET
AS PER NIT
2 documents required · 2 mandatory
₹0
Exempted
27 Apr 2026
8 Apr 2026
18 Apr 2026
8 Apr 2026
18 Apr 2026
8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 10 | D046-10.2A_Steel Fabrication Built-up section_(D046-10.2A)_(10)Steel(10.2)_Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete(10.2A)material will be issued free of cost from BHEL @ stores. | - | KG | - | - |
| 20 | (DAT.CP10.2) Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting and applying priming coat of approved steel primer all complete. (fabrication of Structural Steel only without erection in position of fabricated items). material will be issued free of cost from BHEL @ stores. | - | CKG | - | - |
| 30 | (10.25) Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (10.25.1) In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete. | - | CKG | - | - |
| 40 | (10.25) Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (10.25.2) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | - | CKG | - | - |
| 50 | (13.61) Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : (13.61.1) Two or more coats on new work. | - | M2 | - | - |
| 60 | (13.61) Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : (DAT.CP13.61.1) Same as above item No 04A but for fabricated structural steel works. Painting Co-efficient for fabricated structural will be taken as 22.19Sqm/MT. | - | MT | - | - |
| 70 | (13.63) Painting with aluminium paint of approved brand and manufacture to give an even shade . (13.63.1) Two or more coats on new work | - | M2 | - | - |
| 80 | (13.63) Painting with aluminium paint of approved brand and manufacture to give an even shade .(DAT.CP13.63.1) Same as above item No 05 A but for fabricated structural steel works. Painting Co-efficient for fabricated structural will be taken as 22.19 Sqm/MT. | - | MT | - | - |
| 90 | (13.99) Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : (13.99.1) One or more coats on old work. | - | M2 | - | - |
| 100 | (13.99) Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : (DAT.CP13.99.1) Same as above item No 06A but for fabricated structural steel works. Painting Co-efficient for fabricated structural will be taken as 22.19 Sqm/MT. | - | MT | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.69 MB
BOQ_65011.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid