Loading…
Loading…
Tender Value
₹28.6 L
EMD Value
₹57,150
Closing Date
24 Aug 2026, 5:00 pmDue today
Executive Engineer
Jal Shakti Division No-I Kasumpati Shimla-9(HP)
block, Providing L/J of GI pipes of various dia at different RDs and C/o protection work etc.) under PDNA.2023.
2026_HPIPH_141168_1
Kasumpti/shimla/LWSS Tikkar Kohan/ Rs.28.56
Open Tender
Civil Works - Water Works
Item Rate
180 days
Kasumpti
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,000
EE Jal Shakti Division No-I Kasumpati Shimla-9
₹57,150
14 Aug 2026
14 Aug 2026
25 Aug 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting in earth work in all kinds of soil such as pick work, jumper work, blasting work and chiselling work etc. and disposal of excavated earth as directed within all leads and lifts. | 64.49 | Cum. | 100 | ₹6,449 |
| 2 | Excavation in foundation, trenches,etc. in earth work in all kinds of soil such as pick work, jumper work,blasting work, hard blasting and chiselling etc. stacking the excavated soil not more than 3 mtrs.clear from the edge of excavation and then returning the stacked soil in 15cm.layers when required into plinths sides of foundations etc.then disposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within all leads and lifts.complete in all respect and to the entire satisfaction of the Engineer-in-charge. | 48.28 | Cum. | 100 | ₹4,828 |
| 3 | Excavation in drains and channels etc. in earth work for pipes upto all depth in all classification of earth work such as pick work, jumper work, saturated soil i/c balling or pumping out water , blasting soft /hard rock or chiseling soft/ hard rock where blasting is prohibited in all lifts including jungle clearance wherever required, trimming and dressing of sides, levelling of beds to correct grade including shoring /struting, planking, timbering and dewatering wherever required stacking the useable /unusable material/soil seperately and after laying,jointing and testing of pipes ,returning the useable soil in treches in 15 cm layers including consolidating of such deposited layer by ramming and watering and then disposing of all surplus excavated soil/ unusable material as directed within all leads and lifts including restoration of un-metalled surfaces to its original condition and including cost of diversion for traffic, night signals, fixing caution boards,crossing over trenches for access to houses, fencing etc. complete in all respect whithin all leads and lifts as per direction of the Engineer-in-charge. | 630 | Cum. | 100 | ₹63,000 |
| 4 | Demolition below grund level upto 1.50 metres depth including stacking of serviceable materials and disposal of unserviceable materials within 20 metres lead complete in all respect i/c all leads and lifts. a)Un-reinforced cement concrete more than 15 CM thickness | 11.88 | Cum. | 100 | ₹1,188 |
| 5 | Providing. and laying cement concrete 1:6:12(1cement: 6sand: 12 graded stone agg.40mm nominal size) and curing complete excluding cost of form work in foundation and plinth. | 5.6 | Cum. | 100 | ₹560 |
| 6 | Prov. and laying cement concrete 1:5:10(1cement:5sand:10 graded stone agg. 40mm nominal size)with 15% plum concrete and curing complete excluding cost of form work in retaining wall/breast wall, the size of plums shall usually be 150mm to 300mm.as per HPPWD specifications within all leads and as per the direction of the Engineer-in-charge. | 8.82 | Cum. | 100 | ₹882 |
| 7 | Providing and laying cement concrete 1:4:8 (1cement: 4sand: 8graded stone agg. 40mm nominal size) and curing complete excluding cost of form work i/c all leads and lifts in foundation and plinth. | 11.41 | Cum. | 100 | ₹1,141 |
| 8Providing and laying cement concrete work 1:2:4(1cement:2sand:4 graded stone agg. 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-charge:- | |||||
| 8.01 | Foundation and plinth. | 11.88 | Cum. | 100 | ₹1,188 |
| 8.02 | Suspended floors, roofs, landings,shelves and their supports balconies, beams, girders, bressumers and cantilevers upto floor two level. | 5.47 | Cum. | 100 | ₹547 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_209521.xls
BOQ • 0.30 MB
6.pdf
Tender Documents • 0.28 MB
Terms.pdf
Tender Documents • 0.22 MB
form8.pdf
Tender Documents • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].