Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance PATHARA ALIPUR ASKA | ASKA | GANJAM | ODISHA | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance AT BANK COLONY PO CHATRAPUR P S CHATRAPUR GANJAM ODISHA | CHATRAPUR | GANJAM | ODISHA | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.4 L
EMD Value
₹3,400
Closing Date
13 Aug 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION NO-II, BERHAMPUR
R.I.Office at Athagadapatna_building
2026_CERWI_137978_1
Online Tender/09/SERWD-II/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
30 days
Ganjam
2 documents required · 2 mandatory
₹2,000
₹3,400
Yes
28 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
5 Aug 2026 - 11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and filling in foundation & plinth with sand in 23.5 cm (9) thick layers including watering and ramming with all cost, conveyance, Royalty, DMF, EMF & Additional Charges of all materials, and labour with T&P required for the work including Cess etc complete. (Measurement will be taken on finished compacted section only) as per direction of Engineer-in-Charge. | 26.93 | cum | 688.7 | ₹18,546.69 |
| 2 | Providing cement concrete of proportion (1:3:6) in foundation and floors using 4cm (3/2) size clean hard black hand broken granite stone metal of approved quality and from approved quarry including hoisting lowering and laying concrete in layers not exceeding 15cm (6) thick to the required level ramming, watering & Curing etc. complete including cost & conveyance of all materials with all Royalty, DMF, EMF & Additional Charges and all labour with T&P required for the work with Cess etc, complete including dewatering if required as per direction of Engineer In Charge. | 21.66 | cum | 5,877.52 | ₹1,27,307.08 |
| 3 | Providing & fixing Plain Gypsum board celling suspended from roof by adjustableGI ceiling angle with spread at a distance notmore than 600mm fixed to roof by Rowl Plug &stiff cleart . Gypsum board 12.5 mm thick held by G.I Perimeter channel MF-3 & intermediate channel MF-7 framing , boarding, jointing &finishing with special type of Gypsum compound etc .including cost, conveyance &of all materials labour with T&P & Cess etc completein all respect as per direction of EIC. | 38.68 | sqm | 2,357.72 | ₹91,196.61 |
| 4 | Supplying,fitting & fixing vetrified tile of premium grade having thickness 8mm to 10mm conforming to 13756 ofsize 60Cm x 60Cm plain (Ivory) in floor with applicationof polymer modified quick set cement based water resistant adhesive conforming IS:15477 of 10 mm thick bed and filling joints with white cement of approved quality including cost,conveyance of all materials, labour,Cess &T &P etcrequired for the work etc, complete in all respect as per specification and direction of Engineer-in-charge. | 44.18 | sqm | 1,174.45 | ₹51,887.2 |
| 5 | Finishing wall surface two coats with any approved water proofing cement paint to outer wall surface after celaning surface including cost of paint watering curing with cost conveyance andof all materials and labour with T&P and Cessrequired for the work etc, complete in all respect as per the direction of Engineer-in-Charge. | 354.75 | sqm | 45.51 | ₹16,144.67 |
| 6 | Finishing wall surface two coats with any approved weather shield cement paintto outer wall surface after celaning surface including cost of paint watering curing with cost conveyance andof all materials and labour with T&P and Cessrequired for the work etc, complete in all respect as per the direction of Engineer-in-Charge. | 375.65 | sqm | 82.62 | ₹31,036.2 |
stage.html
html • 0.04 MB
finance_604748.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.83 MB
Tendernotice_1.pdf
PDF • 3.91 MB
BOQ_604748.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .