Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 CrAccepted-Finance SATNA | MADHYA PRADESH | 485001 | ₹10.4 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹11.4 Cr+₹98.5 L (9.44%)Rejected-Finance | ₹11.4 Cr+₹98.5 L (9.44%) | L2 | Rejected-Finance L2 |
| 3 | L3₹11.6 Cr+₹1.2 Cr (11.1%)Rejected-Finance | ₹11.6 Cr+₹1.2 Cr (11.1%) | L3 | Rejected-Finance L3 |
| 4 | L4₹12.1 Cr+₹1.7 Cr (15.9%)Rejected-Finance | ₹12.1 Cr+₹1.7 Cr (15.9%) | L4 | Rejected-Finance L4 |
| 5 | L5₹12.5 Cr+₹2.1 Cr (19.9%)Rejected-Finance | ₹12.5 Cr+₹2.1 Cr (19.9%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | SHRI SAINATH ASSOCIATE L1 | BANSAL BROTHERS L3 | SUSHIL KUMAR SHARMA L2 | VIRANI ENGICON L4 | Narayan Sahu Contractor L5 |
|---|---|---|---|---|---|---|---|---|
| 1.01 | 1. Design and build sewage treatment plant of installed capacity 1.75 MLD and all appurtenant structures and allied works;
2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 1.69 Km length including survey, design, construction of Required Pumping stations and all appurtenant structures and allied works; and
3. Providing, laying, jointing, testing, commissioning of (i) Sewage Gravity main of RCC NP-3 pipe having length of 100 m of dia 800 mm (ii) Treated water pumping main of DI K-7 pipe having length of 105 m of dia 150 mm and from Treated water Sump to nearby agriculture Land/River including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete.
4. Providing 1690 m RCC drain
5. Construction of 1No. I&D structures including trash trap
6. Treated Water Sump with Pump House
7. Providing, Supplying and erection of Electric Sub Station including required electric conductor with all necessary equipment’s and fittings complete in all respect | 1 | LumpSum | 6,17,00,000 ₹6,17,00,000 Lowest | 7,05,35,000 ₹7,05,35,000 | 6,49,13,000 ₹6,49,13,000 | 6,66,72,570 ₹6,66,72,570 | 6,81,13,000 ₹6,81,13,000 |
| 1.02 | Operation and Maintenance Cost For 1st Years | 1 | LumpSum | 15,69,153 ₹15,69,153 | 14,79,750 ₹14,79,750 Lowest | 14,79,750 ₹14,79,750 Lowest | 17,55,970 ₹17,55,970 | 18,10,000 ₹18,10,000 |
| 1.03 | Operation and Maintenance Cost For 2nd Years | 1 | LumpSum | 16,16,227 ₹16,16,227 | 15,68,535 ₹15,68,535 Lowest | 15,68,535 ₹15,68,535 Lowest | 18,61,328 ₹18,61,328 | 19,11,000 ₹19,11,000 |
| 1.04 | Operation and Maintenance Cost For 3rd Years | 1 | LumpSum | 16,64,714 ₹16,64,714 | 16,62,647 ₹16,62,647 Lowest | 16,62,647.1 ₹16,62,647.1 | 19,73,007 ₹19,73,007 | 21,11,000 ₹21,11,000 |
| 1.05 | Operation and Maintenance Cost For 4th Years | 1 | LumpSum | 16,62,516 ₹16,62,516 Lowest | 17,62,406 ₹17,62,406 | 17,62,405.93 ₹17,62,405.93 | 20,91,387 ₹20,91,387 | 22,11,000 ₹22,11,000 |
| 1.06 | Operation and Maintenance Cost For 5th Years | 1 | LumpSum | 17,66,095 ₹17,66,095 Lowest | 18,68,150 ₹18,68,150 | 18,68,150.28 ₹18,68,150.28 | 22,16,871 ₹22,16,871 | 23,50,000 ₹23,50,000 |
| 1.07 | Operation and Maintenance Cost For 6th Years | 1 | LumpSum | 18,19,078 ₹18,19,078 Lowest | 19,80,650 ₹19,80,650 | 19,80,239.3 ₹19,80,239.3 | 23,49,883 ₹23,49,883 | 24,90,000 ₹24,90,000 |
| 1.08 | Operation and Maintenance Cost For 7th Years | 1 | LumpSum | 18,73,651 ₹18,73,651 Lowest | 20,99,054 ₹20,99,054 | 20,99,053.66 ₹20,99,053.66 | 24,90,876 ₹24,90,876 | 26,11,000 ₹26,11,000 |
| 1.09 | Operation and Maintenance Cost For 8th Years | 1 | LumpSum | 19,29,860 ₹19,29,860 Lowest | 22,24,997 ₹22,24,997 | 22,24,996.88 ₹22,24,996.88 | 26,40,329 ₹26,40,329 | 27,25,000 ₹27,25,000 |
| 1.10 | Operation and Maintenance Cost For 9th Years | 1 | LumpSum | 19,87,756 ₹19,87,756 Lowest | 23,58,596 ₹23,58,596 | 23,58,496.69 ₹23,58,496.69 | 27,98,749 ₹27,98,749 | 28,44,000 ₹28,44,000 |
Tender Value
₹7.5 Cr
EMD Value
₹3.7 L
Closing Date
17 Jul 2026, 6:55 pmClosed
Chief Municipal Officer
Office Of The Municipal Council Pasan, Distt.- Anuppur (M.P.)
Interception And Diversion of Nallahs with STP works Project of Pasan town under SBM 2.0
2026_UAD_519239_1
1315/etender/Pasan/STP/2026
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Lump-sum
365 days
Municipal Coucil Pasan
Please refer Tender documents.
7 documents required · 7 mandatory
₹20,000
₹3.7 L
Municipal Coucil Pasan
3 Sept 2026
3 Jul 2026
20 Jul 2026
3 Jul 2026
17 Jul 2026
3 Jul 2026
7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | 1. Design and build sewage treatment plant of installed capacity 1.75 MLD and all appurtenant structures and allied works;
2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 1.69 Km length including survey, design, construction of Required Pumping stations and all appurtenant structures and allied works; and
3. Providing, laying, jointing, testing, commissioning of (i) Sewage Gravity main of RCC NP-3 pipe having length of 100 m of dia 800 mm (ii) Treated water pumping main of DI K-7 pipe having length of 105 m of dia 150 mm and from Treated water Sump to nearby agriculture Land/River including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete.
4. Providing 1690 m RCC drain
5. Construction of 1No. I&D structures including trash trap
6. Treated Water Sump with Pump House
7. Providing, Supplying and erection of Electric Sub Station including required electric conductor with all necessary equipment’s and fittings complete in all respect | - | LumpSum | 7,49,13,000 | - |
| 1.02 | Operation and Maintenance Cost For 1st Years | - | LumpSum | 19,73,000 | - |
| 1.03 | Operation and Maintenance Cost For 2nd Years | - | LumpSum | - | - |
| 1.04 | Operation and Maintenance Cost For 3rd Years | - | LumpSum | - | - |
| 1.05 | Operation and Maintenance Cost For 4th Years | - | LumpSum | - | - |
| 1.06 | Operation and Maintenance Cost For 5th Years | - | LumpSum | - | - |
| 1.07 | Operation and Maintenance Cost For 6th Years | - | LumpSum | - | - |
| 1.08 | Operation and Maintenance Cost For 7th Years | - | LumpSum | - | - |
| 1.09 | Operation and Maintenance Cost For 8th Years | - | LumpSum | - | - |
| 1.1 | Operation and Maintenance Cost For 9th Years | - | LumpSum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tenderdocument1315.pdf
Tender Documents • 1.81 MB
BOQ_625513.xls
BOQ • 0.28 MB
AnnexureEID1315.pdf
Additional Documents • 2.60 MB
corrigendum1378dateexe.pdf
PDF • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .