Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-Finance | ₹2.7 L | L1 | Accepted-Finance L1 |
| 2 | L2₹2.8 L+₹2,869 (1.05%)Rejected-Finance 5 E B 607003 | CUDDALORE | TAMIL NADU | 607003 | ₹2.8 L+₹2,869 (1.05%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Devi Constructions L2 | A Annadurai L1 |
|---|---|---|---|---|---|
| 1.00Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | |||||
| 1.10 | a. Open Excavation | 5 | m3 | 117 ₹585 | 115 ₹575 Lowest |
| 1.20 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 5 | m3 | 7,083 ₹35,415 | 7,007 ₹35,035 Lowest |
| 1.30 | Supplying and fixing chain link fencing 2" x 2" using 10 gauge Galvanised iron wire including the 40mm GI Post with horizontal and vertical frame section size of 30 x 30mm and fixing the GI post foundation concrete including all cost and conveyance of all materials and labour charges etc complete as directed by departmental officers | 299 | Rm | 654 ₹1,95,546 | 647 ₹1,93,453 Lowest |
| 1.40 | Supplying and fixing MS grill to doors windows and ventilators etc. as directed by the departmental officers inclusive of cost of MS grill and labour charges including one coat of red oxide and fixing in position etc. complete | 370 | Kg | 111 ₹41,070 | 110 ₹40,700 Lowest |
| 1.50 | Painting two coats with best synthetic enamel paint of approved Colour for new iron works the rate is inclusive of all materials, brushes and scaffolding charges etc., complete complying with standard specification(paint should be got approved by the Departmental Engineer befor use on work. | 16 | m2 | 160 ₹2,560 | 159 ₹2,544 Lowest |
Tender Value
₹3.5 L
EMD Value
₹3,500
Closing Date
27 Feb 2026, 3:00 pmClosed
THE COMMISSIONER, SALEM CITY MUNICIPAL CORPORATION
Salem City Municipal Corporation, Fort Main Road, Salem.
Providing Chain Link Fencing With Gate at Burial Ground in Pension Cross Road Ward-AA Block 58 T.S No.19,20 and 21 in Div-47 of Kondalampatty Ward Office.
2026_MAWS_659159_1
E3-EST NO 237-B 2025-2026
Open Tender
Civil Works
Lump-sum
30 days
Salem City Municipal Corporation
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹3,500
7 Jul 2026
17 Feb 2026
27 Feb 2026
17 Feb 2026
27 Feb 2026
17 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | |||||
| 1.1 | a. Open Excavation | 5 | m3 | - | - |
| 1.2 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 5 | m3 | - | - |
| 1.3 | Supplying and fixing chain link fencing 2" x 2" using 10 gauge Galvanised iron wire including the 40mm GI Post with horizontal and vertical frame section size of 30 x 30mm and fixing the GI post foundation concrete including all cost and conveyance of all materials and labour charges etc complete as directed by departmental officers | 299 | Rm | - | - |
| 1.4 | Supplying and fixing MS grill to doors windows and ventilators etc. as directed by the departmental officers inclusive of cost of MS grill and labour charges including one coat of red oxide and fixing in position etc. complete | 370 | Kg | - | - |
| 1.5 | Painting two coats with best synthetic enamel paint of approved Colour for new iron works the rate is inclusive of all materials, brushes and scaffolding charges etc., complete complying with standard specification(paint should be got approved by the Departmental Engineer befor use on work. | 16 | m2 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_790815.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .