| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.9 LQualified Make: Insmart Systems
Model: INSMART MAKE MODEL MBM07 4S-250 203 8 2 16 D 89PLOT NO 89 S K VILLA YOSUFGUDA HYDERABAD TELANGANA 500018 | MEDCHAL MALKAJGIRI | TELANGANA | 500018 | Make: Insmart Systems
Model: INSMART MAKE MODEL MBM07 4S-250 | L1 | Qualified | |
| 2 | L2₹11.8 L+₹3.0 L (33.2%)Qualified Make: AI SCIENTIFIC
Model: AI-VPB-2 01 DODHPUR KELA NAGAR ALIGARH UTTAR PRADESH 202001 | ALIGARH | UTTAR PRADESH | 202001 | Make: AI SCIENTIFIC
Model: AI-VPB-2 | L2 | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
30 Dec 2025, 2:00 pmClosed
Planetary Ball Mill for Laboratory (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/7016097 Dated : 19-12-2025 Bid Document 1/10 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 17 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : The President of India
(Acting through Regional Director
P&S) Department of Atomic Energy
Directorate of Purchase And Stores Raja Ramanna Centre for Advanced Technology
Indore-452013 (MP) PG-II/72205 Note- If any bidder opts for submission of demand draft in place of Bank Guarantee then it should be in favour of Pay & Accounts Officer
RRCAT" payable at Indore. (.)
8730618
GEM/2025/B/7016097
Two Packet Bid
Planetary Ball Mill for Laboratory (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
90 days
I 452013, Indore Regional Purchase & Stores Unit (DPS/DAE) Raja Ramana Centre for Advanced Technology P.O. CAT
Total value wise evaluation
PRODUCT
1 document required · 1 mandatory
Exempted
19 Dec 2025
19 Dec 2025
30 Dec 2025
Planetary Ball Mill for Laboratory (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/7016097 Dated : 19-12-2025 Bid Document 1/10 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 17 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : The President of India
(Acting through Regional Director
P&S) Department of Atomic Energy
Directorate of Purchase And Stores Raja Ramanna Centre for Advanced Technology
Indore-452013 (MP) PG-II/72205 Note- If any bidder opts for submission of demand draft in place of Bank Guarantee then it should be in favour of Pay & Accounts Officer
RRCAT" payable at Indore. (.)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8730618.pdf
GEM_BID
1766056691.pdf
OTHER
NoteXI_890899c9-b5b3-4049-8c3e1766033327281_apotwo.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .