| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAccepted-Finance 14 PANJ BAKHTAR ROAD JAMMU J K UT | JAMMU | JAMMU | JAMMU AND KASHMIR UT | ₹18.4 L | L1 | Accepted-Finance Accepted L1 |
| 2 | L2₹20.0 L+₹1.6 L (8.42%)Rejected-Finance NOT SPECIFIED | ₹20.0 L+₹1.6 L (8.42%) | L2 | Rejected-Finance L2 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
17 Jun 2026, 5:00 pmClosed
Executive Engineer PMGSY Division Jammu
Executive Engineer PMGSY Division Jammu
Permanent Restoration of L027-Khery to Rehal road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-178, Block Bishnah, District Jammu
2026_JKRRD_148181_1
e-NIT No. EE/PMGSY/J/15 of 2026-27 Dated. 05.06.2026
Open Tender
Civil Works - Roads
Percentage
30 days
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
₹40,000
Executive Engineer PMGSY Division Jammu
9 Jul 2026
6 Jun 2026
18 Jun 2026
6 Jun 2026
17 Jun 2026
6 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:: All kinds of soil : | 411.6 | Cum | 576.45 | ₹2,37,266.82 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 44.1 | Cum | 4,826.5 | ₹2,12,848.65 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 161.7 | Cum | 5,733.6 | ₹9,27,123.12 |
| 4 | viding, laying, spreading and compacting graded stone aggregate (size
range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification
including premixing the material with water at OMC in mechanical mix
plant, carriage of mixed material by tipper to site, for all leads & lifts,
laying in uniform layers with mechanical paver finisher in sub- base / base
course on well prepared surface and compacting with vibratory roller of 8
to 10 tonne capacity to achieve the desired density, complete as per
specifications and directions of Engineer-in-Charge | 64 | Cum | 1,885.95 | ₹1,20,700.8 |
| 5 | Providing and applying tack coat using hot straight run bitumen of grade –
VG-10, including heating the bitumen, spraying the bitumen with
mechanically operated spray unit fitted on bitumen boiler, cleaning and
preparing the existing road surface as per specifications. On bitumen surface @ 0.50 Kg/sqm. | 600 | Sqm | 55.2 | ₹33,120 |
| 6 | 2.5 cm premix carpet surfacing with 2.25cum and 1.12 cum of stone
chippings of 13.2 mm and 11.2mm size respectively per 100 sqm and 52
kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and
11.2 mm size respectively including a tack coat with hot straight run
bitumen including consolidation with road roller of 6 to 9 tonne capacity
etc. complete (tack coat to be paid for separately). With paving Asphalt grade VG-30 with no solvent. | 600 | Sqm | 268.15 | ₹1,60,890 |
| 7 | Providing and laying seal coat of premixed fine aggregate (passing 2.36
mm and retained on 180 micron sieve) with bitumen using 128 kg of
bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum
of fine aggregate per 100 sqm of road surface including rolling and
finishing with road all complete. | 600 | Sqm | 101.4 | ₹60,840 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 294 | Sqm | 286.35 | ₹84,186.9 |
| 9Carriage of Material by Mechanical Transport including loading & unloading stacking at site complete. | |||||
| 9.01 | Sand nominal size average lead 30 KM by MT. | 100.33 | Cum | 520.34 | ₹52,205.71 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_231792.xls
BOQ • 0.25 MB
Corigendum15.pdf
PDF • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .