Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹93.8 LAdmitted-Finance | -15.00% | ₹93.8 L | L1 | Admitted-Finance |
| 2 | L1₹93.8 LAdmitted-Finance | -15.00% | ₹93.8 L | L1 | Admitted-Finance |
| 3 | L1₹93.8 LAdmitted-Finance | -15.00% | ₹93.8 L | L1 | Admitted-Finance |
| 4 | L1₹93.8 LAdmitted-Finance | -15.00% | ₹93.8 L | L1 | Admitted-Finance |
| 5 | L1₹93.8 LAdmitted-Finance 0 JAGDISHPUR SOHOULI MARTINGANJ TEH MARTINGANJ AZAMGARH UTTAR PRADESH 276301 | AZAMGARH | UTTAR PRADESH | 276301 | -15.00% | ₹93.8 L | L1 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹7.5 L
Closing Date
7 Jul 2026, 3:00 pmClosed
Chief Engineer
Lucknow Municipal Corporation
Construction of drains and concrete roads in damaged internal streets in Barigawan under Hind Nagar Ward.
2026_DOLBU_1163689_1
57(8)/CE/2026-27/14
Open Tender
Civil Works
Percentage
Lucknow Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹13,025
Lucknow Municipal Corporation
₹7.5 L
3 Sept 2026
24 Jun 2026
7 Jul 2026
24 Jun 2026
7 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of R.C.C. ramp | 3.6 | Cum | 2,805 | ₹10,098 |
| 2 | Dismentling of C.C. Flooring | 15.84 | Cum | 1,922.92 | ₹30,459.05 |
| 3 | Dismentling of old damage steel mould interlocking incl. all material etc comp. | 2,717.56 | Cum | 104.07 | ₹2,82,816.47 |
| 4 | E/W Excavation in ordinary soil | 610.92 | Cum | 140.21 | ₹85,657.09 |
| 5 | S/L P.C.C. 1:5:10 in cement, C-sand, stone gritt | 97.74 | Cum | 4,889.51 | ₹4,77,900.71 |
| 6 | S/L polythene sheet of 125 μm etc all comp. | 3,034.39 | Sqm | 15 | ₹45,515.85 |
| 7 | S/L G.S.B. mixed stone gritt | 303.43 | Cum | 3,866.86 | ₹11,73,321.33 |
| 8 | P/L C.C. work in 1:1.5:3 of Cement, C-sand, Stone gritt including all material etc complete work | 455.15 | Cum | 6,588.85 | ₹29,98,915.08 |
| 9 | R.C.C. in 1:1.5:3 of cement, c-sand, stone gritt | 426.62 | Cum | 7,145.69 | ₹30,48,494.27 |
| 10 | M.S. or Iron work in plain | 167.44 | Qtl | 8,519 | ₹14,26,421.36 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_2181660.xls
BOQ • 0.28 MB
RFPTwoBidSign.pdf
Tender Documents • 6.07 MB
Dateextension.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .