Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.1 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹15.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹15.1 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹15.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹15.1 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹15.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹15.1 LAdmitted-Fee/PreQual/Technical/Finance KHATI SAHI PO CHILIKA NUAPADA DS KRUSHNA PRASAD GANJAM ODISHA PIN 752011 | PURI | ODISHA | 752011 | +0.00% | ₹15.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹15.1 LAdmitted-Fee/PreQual/Technical/Finance KHATI SAHI PO CHILIKA NUAPADA DS KRUSHNA PRASAD GANJAM ODISHA PIN 752011 | PURI | ODISHA | 752011 | +0.00% | ₹15.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹15.1 L
EMD Value
₹15,200
Closing Date
21 Sept 2026, 4:00 pmClosed
S.E Ganjam Rand B Div No I BAM
O/O S.E Ganjam Rand B Div No I BAM
Construction of Govt. ITI Boys Hostel Drain with Cover Slab (R.H.S.) at Govt. ITI Berhampur in the district of Ganjam Buildings.
2026_EICCL_140915_1
SE (R and B) Divn. I BAM No.19/2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
Ganjam
2 documents required · 2 mandatory
₹6,000
₹15,200
Yes
22 Sept 2026
11 Sept 2026
22 Sept 2026
11 Sept 2026
21 Sept 2026
11 Sept 2026
11 Sept 2026 - 21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work : Earthwork in excavation in foundation in hard soil or gravelly soil including hard moorum, stony earth mixed with boulders (except sheet rock and boulders requiring blasting) with all leads and lifts including dressing and levelling the bed and depositing the excavated earth at places away from worksite with all leads and lifts including cost of all labour and T&P cess and dewatering if required for the work etc. complete and as directed by the Engineer-in-charge.(excluding GST) | 216 | cum | 282.89 | ₹61,104.24 |
| 2 | Supplying and filling in foundation and plinth with sand excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as directed by the Engineer-in-charge. | 27 | cum | 822.46 | ₹22,206.42 |
| 3 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm size clean hard black crusher broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15 cm. (6") thick to the required level ramming, watering, curing etc. complete including cost, conveyance, royalties of all materials with all labour and T&P required for the work etc. complete in all respect and as per the direction of the Engineer-in-charge. | 32.4 | cum | 5,991.05 | ₹1,94,110.02 |
| 4 | R.C.C. work of proportion M-20 grade having minimum compressive strength in work test of 200 Kg/Cm2 at 28 days using 20 mm and down graded size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering and laying concrete and compacting by using vibrators watering, curing for 28 days, centring & shuttering and finishing the exposed surface smooth providing grooves or beads where necessary in all floors including cost, conveyance, royalties and taxes of all materials , cost of all labour with cost of all T&P required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or steel & binding wires and labour charges for strengthening, cutting, bending grills and placing in proper position etc complete as per direction of Engineer-in-Charge. Column base. | 62.1 | cum | 6,423.6 | ₹3,98,905.56 |
| 5 | Plinth Bend | 72 | cum | 7,298.03 | ₹5,25,458.16 |
| 6 | Cutting, straightening coiled or bent up M.S. Rod or tor steel of SAIL/ TATA / RINL (VIZAG) make including bending, binding, welding and joining if necessary and tying the grills and placing in position as required for R.C.C. Work and for providing fan hooks as required, hoisting, lowering, laying including cost, conveyances, taxes of M.S. Rod or tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all floors (Linear measurement will be taken and quantity will be calculated basing on the standard weight of B.I.S. for M.S. Rods or tor steel only. Wastage if any, including weight of binding wire will not be considered for measurement) etc. complete as per specification & direction of Engineer-in-charge. | 25.52 | qtl | 8,924.6 | ₹2,27,755.79 |
| 7 | Filling in foundation and plinth with available excavated earth including watering, ramming with cost, conveyances, royalties of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge | 166.67 | sqm | 207.68 | ₹34,614.03 |
| 8 | Carriage of earth by mechanic means with cost of all leads and lift upto 5.00 km including with cost conveyance cess and royalties of all materials and labour with T&P required for the work etc. complete (excluding GST) | 178.44 | sqm | 276.01 | ₹49,251.22 |
stage.html
html • 0.07 MB
finance_609484.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.25 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_609484.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .