Loading…
Loading…
Tender Value
₹8.0 L
EMD Value
₹8,000
Closing Date
21 Jul 2026, 3:00 pm3d left
Superintending Engineer
Electricity Construction and Works Circle-II, P.V.V.N.L., Victoria Park, Meerut
Increasing Capacity of SS
2026_PVVNL_1169961_1
23/ECWC-II/MRT/2026-27
Open Tender
Electrical Works
Lump-sum
30 days
Meerut
Please refer tender notice and Documents
2 documents required · 2 mandatory
₹1,180
Yes
payable at EE, ECWD, Meerut
₹8,000
Yes
16 Jul 2026
16 Jul 2026
22 Jul 2026
16 Jul 2026
21 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairing of power T/F. Plinth for new 8 MVA T/F | 1 | Job | - | - |
| 2 | Safe carriage of Following Item from any store Centre (Under Jurisdiction fo PVVNL) to Site Store with loading & unloading at both ends respectively (2 to 5)
11 KV 3×300 mm2 XLPE Cable | 50 | Mtr | - | - |
| 3 | 11 KV j/kit 3x300mm outdoor heat | 1 | No. | - | - |
| 4 | 11 KV j/kit 3x300mm indoor heat | 1 | No. | - | - |
| 5 | Transformer Oil | 210 | Ltr | - | - |
| 6 | Painting of Structures:-
Painting of the following structure with one coat of ready mixed primer and two coats of ISI Mark Aluminum paint after rubbing with sand paper to the surface of the structure including labor and T&P complete in all respect. Terminal Gantry/Bus Bar Gantry/Line Isolator/Bus Isolator/Post Insulator/Fuse Set/C.T.s/P.T.s/L.A.'s structures, ST pole etc. | 1 | Job | - | - |
| 7 | Hiring of D/G Set including carriage, loading, unloading & operating charges (with fuel) at 33/11 KV Substation under construction in case L.T. supply is not available near S/S within prescribed accessible limit. 63 KVA, 3 Phase D/G Set for testing of equipment installed at Substation | 1 | Per set Per day | - | - |
| 8 | Dismantling all connections (Control cable, Earthing, 11 KV Bus bar, Power cable, cable Stand & Neutral stand etc.) of Existing 5 MVA Transformer. | 1 | Job | - | - |
| 9 | Dismantling of existing 5 MVA Transformer accessories like Radiator, Conservator & Draining oil from Radiator fill in the drums and other works to be done as Neccesary | 1 | Job | - | - |
| 10 | Safely Shifting of 5 MVA Transformer (Dismanteled) from Plinth and kept aside in the Switchyard at Suitable place. | 1 | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
TenderDocumentsofTNo23_3.pdf
Tender Documents • 1.12 MB
BOQ_2195332.xls
BOQ • 0.31 MB
FormABandOMNo2413and2259.pdf
Additional Documents • 11.57 MB
Download all tender documents and submit your bid