Loading…
Loading…
Tender Value
₹16.9 L
EMD Value
₹16,941
Closing Date
20 Jul 2026, 5:00 pm
Executive Officer,Kashinagar NAC
Executive Officer,Kashinagar NAC
Construction of Market Complex at Market Junction , W.No.07 and 08
2026_ORULB_134833_7
KNGR/NAC/01/2026-27
Open Tender
Civil Works - Buildings
120 days
Kashinagar NAC
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
Executive Officer, Kashinagar NAC
₹16,941
Yes
9 Jul 2026
9 Jul 2026
23 Jul 2026
9 Jul 2026
20 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation hard soil within initial lead and lift leveling the bed | 34.52 | Cum | 312.13 | ₹10,774.73 |
| 2 | Supplying Filling sand in foundation with well Watered & Rammed including cost ,conveyance and royality of sand and cost of labour T&P etc. complete | 25.63 | Cum | 544.47 | ₹13,954.77 |
| 3 | CC (1:3:6) using 40 mm size CBHG Metal including cost of all materials labour ,T & P watering curing etc . Complete | 6.76 | Cum | 5,960.6 | ₹40,293.66 |
| 4 | Brick Masonary with Flyash Brick of size 23x11x8 in CM (1:6) in foundtion & Plinth comp. Per cum | 43.31 | Cum | 5,429.83 | ₹2,35,165.94 |
| 5 | CC (1:4:8) using 40 mm size CBHG Metal including cost of all materials labour ,T & P watering curing etc . Complete | 6.02 | Cum | 5,569.28 | ₹33,527.07 |
| 6 | Reinforced Cement concrete M20 using 20mm down-graded HGCB chips | 39.78 | Cum | 6,450.43 | ₹2,56,598.11 |
| 7 | Supplying,cutting ,bending ,binding and tying iron rods & placing uncoted HYSD bar reinforcement In position etc.comp. per Qtl. | 41.77 | Qtl | 9,271.92 | ₹3,87,288.1 |
| 8 | Rigid & smooth centering shuttering for Rcc work including false work & dismantling after casting etc. comp.(Column and Wall Beam) | 80.47 | Sqm | 1,247.94 | ₹1,00,421.73 |
| 9 | Rigid & smooth centering shuttering for Rcc work including false work & dismantling after casting etc. comp.(Column and Grade Beam) | 54.53 | Sqm | 249.83 | ₹13,623.23 |
| 10 | Rigid & smooth centering shuttering for Rcc work including false work & dismantling after casting etc. comp.(Lintel) | 10.6 | Sqm | 577.73 | ₹6,123.94 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_600349.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid