Loading…
Loading…
Tender Value
₹65 L
EMD Value
₹5.3 L
Closing Date
29 Sept 2026, 12:00 pm7d left
SE BSR Circle PWD Bulandshahr
SE BSR Circle PWD Bulandshahr
Reconstruction of a small bridge with a 9 meter span, located at the Makhaina escape on the Mau-Fatehpur link road at km-1in District Bulandshahr
2026_CEMRT_1187171_5
8877/96M/E-Tender/Bsr Circle/2026-27 Dt. 05.09.2026
Open Tender
Civil Works - Bridges
Percentage
180 days
Bulandshahar
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹5.3 L
SE BSR Circle PWD Bulandshahr
22 Sept 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
22 Sept 2026 - 23 Sept 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification.Sr No. 2.6 Ref No.202 Including cost of all material, labour, T&P, and all taxes labour cess etc. required for proper completion of work as per direction by the Engineer-in-charge. But excluding cost of GST. | 80 | Cum | 450 | ₹36,000 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical SpecificationSr No. 2.5 Ref No.202 Including cost of all material, labour, T&P, and all taxes labour cess etc. required for proper completion of work as per direction by the Engineer-in-charge. But excluding cost of GST. | 31 | Cum | 1,100 | ₹34,100 |
| 3 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Including cost of all material, labour, T&P, and all taxes labour cess etc. required for proper completion of work as per direction by the Engineer-in-charge. But excluding cost of GST. | 700 | Cum | 40 | ₹28,000 |
| 4 | Filling in foundation trench as per drawing technical specification SI.No 11.2 Ref No. 300 & 1200 including supply of all material, labour, T&P all taxes royalty, labour cess etc. required for proper completion of work. Including cost of all material, labour, T&P, and all taxes labour cess etc. required for proper completion of work as per direction by the Engineer-in-charge. But excluding cost of GST. | 80 | Cum | 700 | ₹56,000 |
| 5 | Providing concrete for Plain/Reinforced cement concrete (P.C.C Grade M-10) in open foundation complete as per drawing and technical specifications Clauses 802, 803, 1202 & 1203 Sr No. 11.4 Ref No.800 & 1200 Including cost of all material, labour, T&P, and all taxes labour cess etc. required for proper completion of work as per direction by the Engineer-in-charge. But excluding cost of GST. | 29 | Cum | 8,000 | ₹2,32,000 |
| 6 | Providing concrete for Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications Clauses 802, 803, 1202 & 1203 Sr No. 11.4 Ref No.800 & 1200 (RCC M-25) Including necessary centering and shuttering etc. Including cost of all material, labour, T&P, and all taxes labour cess etc. required for proper completion of work as per direction by the Engineer-in-charge. But excluding cost of GST. | 75 | Cum | 8,900 | ₹6,67,500 |
| 7 | RCC M25 Providing concrete for Plain/Reinforced cement concrete in sub structuren complete as per drawing and technical specifications Clauses 802, 803, 1202 & 1203 Sr No. 12.5 Ref No.800 (M-25) Including necessary centering and shuttering etc. including cost of all material, labour, T&P, and all taxes labour cess etc. required for proper completion of work as per direction by the Engineer-in-charge. But excluding cost of GST. | 80 | Cum | 9,400 | ₹7,52,000 |
| 8 | RCC M25 Providing concrete for Plain/Reinforced cement concrete in super structure complete as per drawing and technical specifications Clauses 802, 803, 1202 & 1203 Sr. No. 13.1 Ref. No. 800 (M-25) Including necessary centering and shuttering etc. including cost of all material, labour, T&P, and all taxes labour cess etc. required for proper completion of work as per direction by the Engineer-in-charge. But excluding cost of GST. | 51 | Cum | 10,000 | ₹5,10,000 |
| 9 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Clause 800 and 1206.3 Sr No. 13.5 Ref No. 800 (M-30) Including cost of all material, labour, T&P, and all taxes labour cess etc. required for proper completion of work as per direction by the Engineer-in-charge. But excluding cost of GST. | 5.5 | Cum | 15,200 | ₹83,600 |
| 10 | Supplying, Fitting and Placing TMT bar Reinforcement (Fe 415) in substructure complete as per Drawing and Technical Specifications. Clauses 1002,1005,1010 & 1202 Including cost of all material, labour, T&P, and all taxes labour cess etc. required for proper completion of work as per direction by the Engineer-in-charge. But excluding cost of GST. | 12 | MT | 79,000 | ₹9,48,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_2238762.xls
BOQ • 0.38 MB
T2.pdf
Tender Documents • 1.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .