Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Finance | ₹6.9 L | L1 | Admitted-Finance |
| 2 | L2₹11.1 LAdmitted-Finance | ₹11.1 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Suresh Chandra Thekedar L2 | AASTHA CONTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Silt clearance of Drain | |||||
| 1.01 | Silt Clearance/trench digging of wet earth including lift upto 1.5m and lead upto 6.0m including cost of driver/assistant driver,POL, maintenance of machine,contractor profit,tax etc with rough/partial dressing but excluding levelling&compaction by pocklin/equivalent capacity 2280/60(Rs 2280 per hour) | 15,293.85 | cum | 25 ₹3.8 L | 30 ₹4.6 L |
| 1.02 | scrapping in internal section of existing drain i.e. slope with silt upto 5cm as per SOR chapter no IV/19pg 10 | 10,260 | sqm | 32.5 ₹3.3 L | 4 ₹41,040 |
| 1.03 | Silt Clearance/trench digging of wet earth INCLUDING SLUSH AND LEHEL including lift upto 1.5m and lead upto 6.0m including cost of driver/assistant driver,POL, maintenance of machine,contractor profit,tax etc with rough/partial dressing but excluding levelling&compaction by pocklin/equivalent capacity 2280/60(Rs 2280 per hour) | 5,584.4 | CUM | 70 ₹3.9 L | 34.5 ₹1.9 L |
Tender Value
Refer Docs
EMD Value
₹27,600
Closing Date
1 Jun 2026, 12:00 pmClosed
Executive Engineer Drainage DivisionAligarh
Executive Engineer Drainage DivisionAligarh
Silt clearance of Sirsa drain from km 203.650 to km 210.600 and km 230.587 and km 235
2026_UPIDC_1152951_6
01/EE/2026-27
Open Tender
Civil Works - Others
Hathras
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹27,600
8 Jun 2026
25 May 2026
1 Jun 2026
25 May 2026
1 Jun 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Silt clearance of Drain | ||||||
| 1.01 | Silt Clearance/trench digging of wet earth including lift upto 1.5m and lead upto 6.0m including cost of driver/assistant driver,POL, maintenance of machine,contractor profit,tax etc with rough/partial dressing but excluding levelling&compaction by pocklin/equivalent capacity 2280/60(Rs 2280 per hour) | 1 | cum | - | - | BI01010001010000000000000515BI0100001113 |
| 1.02 | scrapping in internal section of existing drain i.e. slope with silt upto 5cm as per SOR chapter no IV/19pg 10 | 10,260 | sqm | - | - | BI01010001010000000000000515BI0100001113 |
| 1.03 | Silt Clearance/trench digging of wet earth INCLUDING SLUSH AND LEHEL including lift upto 1.5m and lead upto 6.0m including cost of driver/assistant driver,POL, maintenance of machine,contractor profit,tax etc with rough/partial dressing but excluding levelling&compaction by pocklin/equivalent capacity 2280/60(Rs 2280 per hour) | 5,584.4 | CUM | - | - | BI01010001010000000000000515BI0100001114 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_2160164.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid