| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.8 LAccepted-AOC | L1 | Accepted-AOC Admitted | |
| 2 | L2₹61.1 L+₹25,584.41 (0.42%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | V Vediyappan L1 | Alagesan Contractor L2 |
|---|---|---|---|---|---|
| 1.00Construction of New Hostel Building at RIRD in Krishnagiri Dam - Rs. 61.50 /- Lakhs | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete | 30.83 | Cum | 263.46 ₹8,122.47 Lowest | 264.57 ₹8,156.69 |
| 3.00 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 37.12 | Cum | 5,351.99 ₹1,98,665.87 Lowest | 5,374.5 ₹1,99,501.44 |
| 4.00 | Brick work in cement Mortor 1:5 mix using second class Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete. | 60.46 | Cum | 6,145.38 ₹3,71,549.67 Lowest | 6,171.22 ₹3,73,111.96 |
| 5.00 | Supplying and errecting shuttering including necessary support for plane surface including all R.C.C Works etc., Complete.ted 1 lit of water and strictly in accordance with the manufacturer's specification. | 607.86 | Sqm | 1,093.69 ₹6,64,810.4 Lowest | 1,098.29 ₹6,67,606.56 |
| 6.00 | R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete | 81.43 | Cum | 9,069.22 ₹7,38,506.58 Lowest | 9,107.36 ₹7,41,612.32 |
| 7.00 | Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard | 7.15 | Mt | 91,748.27 ₹6,56,000.13 Lowest | 92,134.08 ₹6,58,758.67 |
| 8.00 | Paving the floor with coloured joint free virtified tiles of size 600x600x8mm of best quality and approved variety complying/conforming ISI specification land over cement mortar 1:3(one of cement and three of sand) 20 mm thick and pointed with same colour | 328.19 | Sqm | 1,191.98 ₹3,91,195.92 Lowest | 1,196.99 ₹3,92,840.15 |
| 9.00 | Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete | 30.72 | Sqm | 1,060.61 ₹32,581.94 Lowest | 1,065.07 ₹32,718.95 |
| 10.00 | Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete. | 104.4 | Sqm | 1,427.81 ₹1,49,063.36 Lowest | 1,433.82 ₹1,49,690.81 |
Tender Value
₹61.5 L
EMD Value
₹62,000
Closing Date
27 Nov 2025, 3:00 pmClosed
Project Director DRDA Krishnagiri
DRDA Krishnagiri
Construction of New Hostel Building at RIRD in Krishnagiri Dam at Krishnagiri Block In Krishnagiri DT Under RIRD 2025-2026 Package No TN 04 KRI 266
2025_RDTN_622834_1
RocNo_8003_2018_R3_07_11_2025
Open Tender
Civil Works - Buildings
Item Rate
270 days
Krishnagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹62,000
DRDA Krishnagiri
20 Jan 2026
12 Nov 2025
27 Nov 2025
12 Nov 2025
27 Nov 2025
12 Nov 2025
19 Nov 2025
Amount
Construction of New Hostel Building at RIRD in Krishnagiri Dam - Rs. 61.50 /- Lakhs
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Brick work in cement Mortor 1:5 mix using second class Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete.
Supplying and errecting shuttering including necessary support for plane surface including all R.C.C Works etc., Complete.ted 1 lit of water and strictly in accordance with the manufacturer's specification.
R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard
Paving the floor with coloured joint free virtified tiles of size 600x600x8mm of best quality and approved variety complying/conforming ISI specification land over cement mortar 1:3(one of cement and three of sand) 20 mm thick and pointed with same colour
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and fixing of steel door size of 1.20x2.10m including all cost and labour charges etc., complete
Supplying and fixing of PVC door size of 0.75x2.10m including all cost and labour charges etc., complete
Supplying and fixing of Steel window size of 1.80x1.30m including all cost and labour charges etc., complete
Supplying and fixing of steel Ventilator size of 0.90x0.60m including all cost and labour charges etc., complete
Supplying and fixing of steel Gate & Window Grill size of following including all cost and labour charges etc., complete
Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Oil Distempering Two Coats over Plastering Surface including cost and conveyance of materials and labour charges etc complete
Exterior Emulsion Painting Two Coats with Approved Emulsion Paint over Cement Plastered surface including cost and conveyance of materials and labour charges etc complete.
Supply and fixing of Cuddapah slab including cost and conveyance of materials and labour charges etc complete.
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer
Provision for Water supply arrangements
2000 litre Sintex tank
32mm PVC pipe
32mm PVC Elbow
32mm PVC Tee
25mm PVC pipe
25mm PVC Elbow
25mm PVC Tee
SS Swan Neck Tap
Wash Basin
Provision for Sanitary arrangements
110mm PVC pipe
110mm PVC Bend
110mm PVC Tee
Provision for Rain water Harvesting pipe with specials (110mm PVC pipe)
Provision for Electrical arrangements
Light & Fan Point SD.no.24
Supply&Fixing of Tube Light SD.no.88
Supply & Fixing of Fan SD.no.107
Plug Point SD.no.12
Supply and fixing of TNEB meter Board suitable for 32A Single Phase service connection with 32A Fuse unit (500V) 32A neutral link and earth link (1" x 1/8" Copper flat) on TW plank of size 375mm x 300mm x 19mm with supporting TW reepers of 1" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EB meter to fuse unit. (SD No.125)
Service pipe SD.no.69
Service Connection SD.no.67
Service Charge to EB
Provision for Name board
Provision for Photograpic charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Alagesan Contractor (BID ID -1521794)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_744790.xls
BOQ • 0.30 MB
tb266.pdf
Tender Documents • 0.64 MB
pb266.pdf
Tender Documents • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .