| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹1.2 CrAccepted-AOC BIDHAN ROAD SILIGURI 734001 | SILIGURI | JALPAIGURI | WEST BENGAL | 734001 | L 1 | Accepted-AOC Accepted | |
| 2 | L 2₹1.3 Cr+₹2.4 L (1.95%)Rejected-Finance | L 2 | Rejected-Finance Rejected, higher bid value | |
| 3 | L 3₹1.3 Cr+₹9.1 L (7.30%)Rejected-Finance GANGARAMPUR DAKSHIN DINAJPUR | GANGARAMPUR | DAKSHIN DINAJPUR | WEST BENGAL | L 3 | Rejected-Finance Rejected, higher bid value |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
20 Feb 2026, 3:00 pmClosed
SE NBHC
SE NBHC SAKTIGARH SILIGURI
Natabari Gadadhar Road from 0.000 kmp to 1.010 km, Strengthening work under Cooch Behar Highway Division in the district of Cooch Behar. Project ID PD252645435S000.
2026_SH_992559_1
WBPWD/PW(R)/SE/NBHC/NIeT No. 38 OF 2025-26
Open Tender
CIVIL WORKS
Percentage
90 days
COOCH BEAHR NATABARI
Please refer Tender documents.
4 documents required · 4 mandatory
₹2.4 L
Yes
OFFICE OF SE NBHC
11 May 2026
21 Jan 2026
23 Feb 2026
22 Jan 2026
20 Feb 2026
30 Jan 2026
30 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART A ROAD WORK
Construction of Embankment with Material Obtained from Borrow Pits
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 for Rural Roads of MORD. (Mode of measurement: pre works and post
works)
Land arrange by the agency with Royalty & Cess
Carriage up to total lead of 5.0 km. | 1,200.8 | M3 | 275.6 | ₹3,30,940.48 |
| 2 | Construction of Embankment with Material Obtained from Borrow Pits
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 for Rural Roads of MORD. (Mode of measurement: pre works and post works) | 300.2 | M3 | 85.6 | ₹25,697.12 |
| 3 | Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed.
By mechanical means (without milling machine) :
From 25 mm to 50 mm thick. | 3,750 | M2 | 3.8 | ₹14,250 |
| 4 | Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specifications Clause 202 for Rural Roads of MORD.
By Manual Means
Granular Courses | 112.5 | M3 | 453 | ₹50,962.5 |
| 5 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.
Depth up to 150 mm. | 1,550 | M2 | 14.4 | ₹22,320 |
| 6 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.
Depth up to 300 mm. | 375 | M2 | 33.4 | ₹12,525 |
| 7 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary.
Fine Sand
Compaction factor 0.835 | 38.25 | M3 | 828.38 | ₹31,685.54 |
| 8 | Granular Sub-base with Graded Material (Table:- 400-1)
Plant Mix Method:
Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory power roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants and cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
Grading – V
Using PAKUR variety stone chips | - | M3 | 2,583.63 | - |
| 9 | Wet Mix Macadam Base Course
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting, guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of
Specifications for Road & Bridge Works of MoRT&H (5th Revision).
Using PAKUR variety Stone Chips | 612 | M3 | 2,868.2 | ₹17,55,338.4 |
| 10 | Prime Coat
Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
For WBM / WMM Surface:
Using Bitumen emulsion (SS 1 TYPE) (Bulk) @ 0.85 Kg /m2 | 3,442.5 | M2 | 31.2 | ₹1,07,406 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.21 MB
2911new.pdf
Tender Documents • 0.49 MB
BOQ_2427337.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .