Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.5 LAccepted-Finance NOT AVAILABLE | ₹25.5 L | L1 | Accepted-Finance ACCEPTED |
| 2 | L2₹26.2 L+₹66,914.13 (2.62%)Accepted-Finance | ₹26.2 L+₹66,914.13 (2.62%) | L2 | Accepted-Finance ACCEPTED |
| 3 | L3₹29.3 L+₹3.8 L (14.8%)Accepted-Finance NA | NA | NA | 121004 | ₹29.3 L+₹3.8 L (14.8%) | L3 | Accepted-Finance ACCEPTED |
| 4 | L4₹29.4 L+₹3.8 L (15.0%)Accepted-Finance F1A 1ST FLOOR PLOT NO 26 SRI GANESA APARTMENTS RAVANAN NAGAR 4TH STREET PUZHUTHIVAKKAM MADIPAKKAM CHENNAI 600 091 | CHENNAI | TAMIL NADU | 600091 | ₹29.4 L+₹3.8 L (15.0%) | L4 | Accepted-Finance ACCEPTED |
| 5 | L5₹29.8 L+₹4.2 L (16.6%)Accepted-Finance SUBRAMANIAN NAGAR 1ST STREET SUBRAMANIAN NA | TIRUVANNAMALAI | TAMIL NADU | 604407 | ₹29.8 L+₹4.2 L (16.6%) | L5 | Accepted-Finance ACCEPTED |
Tender Value
₹35.0 L
EMD Value
₹35,100
Closing Date
14 Aug 2026, 3:00 pmClosed
ZONAL OFFICER VIII
NO-36 B,PULLA AVENUE ,SHENOY NAGAR ,CHENNAI-600030
PROPOSED CONSTRUCTION OF GYM BUILDING UNDER CENTRAL PARLIMENTARY MEMBER FUND AT K K NAGAR 10TH STREET IN DIV-98, UNIT-23, ZONE-08
2026_CoC_690620_1
Z.O.VIII.C.NO.E1/2451/2026
Open Tender
Civil Works
Works
270 days
GREATER CHENNAI COPORATION ZONE-VIII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹35,100
17 Aug 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanica...2.40m Footing Depth. (including Refilling charges)Help | 60 | CUM | 368.55 | ₹22,113 |
| 2 | Supplying and filling in foundation, basement, etc...tion and as directed by the departmental officers.Help | 13 | CUM | 391.95 | ₹5,095.35 |
| 3 | Cement Concrete 1:5:10 (One cement, Five crushed ...partmental officers - Mixing by mechanical means Help | 13 | CUM | 5,756.01 | ₹74,828.13 |
| 4 | Supplying, fabricating and placing in position Rib...nt and binding wire) Upto plinth / Basement level Help | 1,900 | KGS | 96.53 | ₹1,83,407 |
| 5 | Supplying, fabricating and placing in position Rib...t and binding wire) Above plinth / Basement level Help | 1,920 | KGS | 98.7 | ₹1,89,504 |
| 6 | Supplying and erecting steel centering including n...l be given after the concrete is laid). FOUNDATIONHelp | 13.5 | SQM | 756.34 | ₹10,210.59 |
| 7 | Supplying and erecting steel centering including n...shall be given after the concrete is laid). COLUMNHelp | 80 | SQM | 669.67 | ₹53,573.6 |
| 8 | Supplying and erecting centering for plane surface...ng shall be given after the concrete is laid).BEAMHelp | 40 | SQM | 1,178.29 | ₹47,131.6 |
| 9 | Supplying and erecting steel centering including n...be given after the concrete is laid) VERTICAL SLABHelp | 110 | SQM | 621.53 | ₹68,368.3 |
| 10 | Providing and laying in position, standardised con...the Department for the excess usage of materials).Help | 33 | CUM | 8,015.86 | ₹2,64,523.38 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
BOQ_830331.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .