| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹35.5 CrAccepted-Finance R O VPO DAULATPUR CHOWK TEHSIL GHANARI DISTRICT UNA HP | UNA | HIMACHAL PRADESH | 174301 | L-1 | Accepted-Finance Accept | |
| 2 | L-2₹36.5 Cr+₹1.0 Cr (2.90%)Rejected-Finance | L-2 | Rejected-Finance Reject | |
| 3 | L-3₹37.8 Cr+₹2.3 Cr (6.37%)Rejected-Finance VILLAGE PO DHUSSARA TEHSIL AMB DISTRICT UNA HP 602489 | UNA | UNA | HP | 602489 | L-3 | Rejected-Finance Reject | |
| 4 | Rejected-Technical VILLAGE SUKA REUR P O REUR SUB TEHSIL REWALSAR DISTT MANDI H P 175023 | REWALSAR | MANDI | HIMACHAL PRADESH | 175023 | - | Rejected-Technical Non Responsive |
Tender Value
₹39.7 Cr
EMD Value
₹49.7 L
Closing Date
25 Mar 2026, 3:00 pmClosed
Executive Engineer
Division HPPWD Bharwain
Devolpment of Mata Chintpurni Temple under Under Sawdesh Darshan 2.0 at Chintpurni Tehsil Amb Distt Una SH Building portion including water supply sanitary installation Septic tank Rain water Harvesting system Boundary wall site development and
2026_PWD_131038_1
Mata Chintpurni Temple Under Swadesh Darshan Job No1 Bharwain Divn
Open Tender
Civil Works
Percentage
545 days
Bharwain
As per tender documents
18 documents required · 18 mandatory
₹40,000
EE Bharwain
₹49.7 L
4 Apr 2026
10 Mar 2026
25 Mar 2026
10 Mar 2026
25 Mar 2026
10 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (hydraulic excavator)/ manual in all height and depths and in all kind of soil including saturated soils comprising of pick work, jumper work, pick jumper work, blasting work both in soft and hard rocks, chiseling/ wedging out of rock (where blasting is prohibited) and their intermediate classification of soil , setting out true to the required line, grades, width, cutting and trimming of side slopes as shown in the drawing and if water is met with in the excavation due to springs, seepage, rain and other causes it shall be removed by the suitable diversion pumping or bailling out and excavation shall be kept dry wherever so required by the contractor at his own cost as directed by the Engineer-In-Charge and disposal all surplus excavated soil in acquired width or at an approved dumping site including its stacking leveling dressing including all lead and lifts by head load, mechnical transportation or by any other mode of transportation with all cost of labours, machineries and other incidentals to complete the work as per HP PWD specification. Any loss to the public/ private property during the course of execution and disposal of unserviceble meterial shall be the absolute responsibility of the contractor which shall have to be compensated by him in all case. The rate is including octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government. | 6,242.51 | Per cubic metre | 197.5 | ₹12,32,895.73 |
| 2 | Excavation work by mechanical means (hydraulic excavator)/ manual in foundation trenches or drains or overall areas in earth work of all kind of soil such as pick work, jumper work, blasting work, jumper blasting work soft and hard blasting and saturated soil, de-watering, including wedging out rocks where blasting is prohibited, chiseling or any other mixed variety of soil, including shoring, strutting or bailing out water upto any depth or any height quantum of water including dewatering removal of slush and stacking the serviceable and unserviceable material clear from the edge of excavation and as per direction of Engineer-In-Charge and returning the stacked soil in 15 cm (Fifteen centimetre) layers, when required into plinths, side of foundation etcetera consolidating each deposited layer by ramming watering and then disposing of all excavated earth as directed by the Engineer-In-Charge, within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is inclusive of octroi, royality, Malkana, Toll tax, sale tax, GST and any other taxes imposed by the Government. | 7,803.7 | Per cubic metre | 439.3 | ₹34,28,165.41 |
| 3 | Excavating trenches of required width for pipes, cables, etcetera including excavation for sockets, and dressing of sides, ramming of bottoms, upto any depth including getting out the excavated soil, then returning the soil as required, in layers not exceeding 20 cm (Twenty centimetre) in depth, including consolidating each deposited layer by ramming, watering, etcetera and disposing of surplus materials/excavated soil as per specification, approved drawing, design, specification and as per the entire satisfaction of Engineer-In-Charge, including carriage of material within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rates are inclusive of octroi, royality malkana ,toll tax, GST or other taxes imposed by the Government. . | 186 | Per running metre | 161 | ₹29,946 |
| 4 | Supplying and filling in plinth with sand under floors,including watering, ramming, consolidating and dressing complete including carriage of material within all leads, lifts and other incidentals. The rates are inclusive of octroi, royality malkana ,toll tax, GST or other taxes imposed by the Government. | 175.28 | Per cubic metre | 1,630.3 | ₹2,85,758.98 |
| 5 | Providing and laying Rubble stone flooring laid in cement mortar 1:3 (One cement : three coarse sand), and pointing and fill the joints with cement mortar 1:3 (One cement : three coarse sand) including curing dressing complete as per specify design pattern and approved colour etcetera including carriage of material within all leads, lifts and other incidentals, as per approved specifications drawing, design and as directed by the Engineer-In-Charge. The rates are inclusive of octroi, royality malkana ,toll tax, GST or other taxes imposed by the Government. | 56.25 | Per cubic metre | 5,238.4 | ₹2,94,660 |
| 6 | Providing and Filling in plinth with hard stone under floors, including watering, ramming, consolidating and dressing complete including carriage of material within all leads, lifts and other incidentals. The rates are inclusive of octroi, royality malkana ,toll tax, GST or other taxes imposed by the Government. | 265.61 | Per cubic metre | 1,436.8 | ₹3,81,628.45 |
| 7 | Providing and filling with stone boulder behind retaining walls of selected hard stone complete including carriage of material within all leads, lifts and other incidentals. The rates are inclusive of octroi, royality malkana ,toll tax, GST or other taxes imposed by the Government. | 212.4 | Per cubic metre | 1,246.5 | ₹2,64,756.6 |
| 8 | Providing and laying mechanically mixed and vibrated plain cement concrete 1:4:8 (One cement : four sand : eight graded stone aggregate 40mm (Forty millimetre) nominal size) and curing complete excluding cost of form work in Retaining wall/return wall/ breast wall and foundation and plinth complete as per architectural drawings including carriage of material within all leads, lifts and other incidentals, as per approved specifications drawing, design and as directed by the Engineer-In-Charge. The rates are inclusive of octroi, royality malkana ,toll tax, GST or other taxes imposed by the Government. | 2.61 | Per cubic metre | 4,909.1 | ₹12,812.75 |
| 9 | Providing and laying mechanically mixed and vibrated plain cement concrete 1:5:10 (One cement : five sand : ten graded stone aggregate 40mm (Forty millimetre) nominal size) and curing complete excluding cost of form work in Retaining wall/return wall/ breast wall and foundation and plinth complete as per architectural drawings including carriage of material within all leads, lifts and other incidentals, as per approved specifications drawing, design and as directed by the Engineer-In-Charge. The rates are inclusive of octroi, royality malkana ,toll tax, GST or other taxes imposed by the Government. | 340.93 | Per cubic metre | 4,578.1 | ₹15,60,811.63 |
| 10 | Providing and laying mechanically mixed and vibrated plain cement concrete 1:3:6 (One cement : three sand : six graded stone aggregate 40mm (Forty millimetre) nominal size) and curing complete excluding cost of form work in Retaining wall/return wall/ breast wall and foundation and plinth complete complete as per architectural drawings including carriage of material within all leads, lifts and other incidentals, as per approved specifications drawing, design and as directed by the Engineer-In-Charge. The rates are inclusive of octroi, royality malkana ,toll tax, GST or other taxes imposed by the Government. | 2,255.73 | Per cubic metre | 5,322.9 | ₹1,20,07,025.22 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.75 MB
SBDMatachintpurni23032026.pdf
Tender Documents • 3.01 MB
BOQ_193752.xls
BOQ • 0.64 MB
CorrigendumMatachitpurni25032026.PDF
PDF • 1.34 MB
CorrigendumNo125032026.PDF
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .