Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹16 L+₹4.4 L (37.6%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹17.0 L+₹5.4 L (46.3%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SAFEENA BEGUM L2 | MAQBOOL HUSSAIN MALIK & SONS L3 | mohd abass L1 |
|---|---|---|---|---|---|---|
| 1.00 | WOODEN FOOT BRIDGE 2 No's of 35 FT SPAN & 3 No's of 15 FT SPAN:- Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth,
1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from
cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil | 23.79 | Cum | 460 ₹10,943.4 | 250 ₹5,947.5 Lowest | 385 ₹9,159.15 |
| 2.00 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah | 37.38 | Cum | 3,000 ₹1,12,140 | 1,250 ₹46,725 Lowest | 2,090 ₹78,124.2 |
| 3.00 | Extraction , transportation and Labur of Wood for making Wooden Foot Bridge of Span 35 ft
complete job as per directed by the site incharge Engage 4 Carpenter for 20 days for making 2 foot bridge of Span 35 ft | 80 | No | 500 ₹40,000 Lowest | 1,000 ₹80,000 | 760 ₹60,800 |
| 4.00 | Extraction , transportation and Labur of Wood for making Wooden Foot Bridge of Span 35 ft
complete job as per directed by the site incharge Engage 8 Labour for 20 days for making 2 foot bridge of Span 35 ft | 160 | No | 400 ₹64,000 Lowest | 1,000 ₹1,60,000 | 475 ₹76,000 |
| 5.00 | Extraction , transportation and Labur of Wood for making Wooden Foot Bridge of Span 35 ft
complete job as per directed by the site incharge Engage 2 Carpenter for 36 days for making 3 foot bridge of Span 15 ft | 72 | No | 500 ₹36,000 Lowest | 1,000 ₹72,000 | 760 ₹54,720 |
| 6.00 | Extraction , transportation and Labur of Wood for making Wooden Foot Bridge of Span 35 ft
complete job as per directed by the site incharge Engage 4 Labour for 36 days for making 3 foot bridge of Span 15 ft | 144 | No | 400 ₹57,600 Lowest | 1,000 ₹1,44,000 | 475 ₹68,400 |
| 7.00 | Providing and fixing of Nails | 60 | Kg | 100 ₹6,000 Lowest | 120 ₹7,200 | 285 ₹17,100 |
| 8.00 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.
Two or more coats on new work over an under coat of suitable shade with ordinary paint of
approved brand and manufacture. | 117.57 | Sqm | 190 ₹22,338.3 | 300 ₹35,271 | 142 ₹16,694.94 Lowest |
| 9.00 | Carriage of materials from source to site of work Stone av. Distance HL 500 Mtr | 37.38 | Cum | 500 ₹18,690 | 400 ₹14,952 Lowest | 760 ₹28,408.8 |
| 10.00 | CONSTRUCTION OF PATH 12000 FT Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not
exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan,
depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed
earth to be levelled and neatly dressed in all kinds of soil | 492.78 | Cum | 416.32 ₹2,05,155.86 | 140 ₹68,989.2 Lowest | 199 ₹98,063.22 |
Tender Value
₹20 L
EMD Value
₹60,000
Closing Date
15 Oct 2025, 4:00 pmClosed
Wildlife Warden Chenab Division,Kishtwar.
Kishtwar
Construction of Track route in Renai Catchment from Kuzuz Nallah (Warwan) To Fariabad including Construction of path, foot bridges, shelter shed and Tenting sites.Under Mitigation Plan , Wildlife Division Kishtwar.for the Year 2025-26
2025_FD_291198_1
NIT 22 OF 2025-26 Track Route Kukuz Nallah to Feriabad
Open Tender
Civil Works
Item Wise
90 days
Renai, Marwah
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Wildlife Warden Chenab Division,Kishtwar.
₹60,000
Yes
24 Oct 2025
8 Oct 2025
16 Oct 2025
8 Oct 2025
15 Oct 2025
8 Oct 2025
Amount
WOODEN FOOT BRIDGE 2 No's of 35 FT SPAN & 3 No's of 15 FT SPAN:- Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil
Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah
Extraction , transportation and Labur of Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge Engage 4 Carpenter for 20 days for making 2 foot bridge of Span 35 ft
Extraction , transportation and Labur of Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge Engage 8 Labour for 20 days for making 2 foot bridge of Span 35 ft
Extraction , transportation and Labur of Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge Engage 2 Carpenter for 36 days for making 3 foot bridge of Span 15 ft
Extraction , transportation and Labur of Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge Engage 4 Labour for 36 days for making 3 foot bridge of Span 15 ft
Providing and fixing of Nails
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.
Carriage of materials from source to site of work Stone av. Distance HL 500 Mtr
CONSTRUCTION OF PATH 12000 FT Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil
Dry random rubble masonry with hard stone in foundation and plinth With bond stone.
Dry stone pitching, 225mm thick, including cost of stones and preparation of surface.
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in -All kinds of soil.
Carriage of materials from source to site of work by M.T.Stone av. Distance HL 500 mtr
CONSTRUCTION OF SHELTER SHED 24'x16' Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) (A) Crushed
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying River Bed Material in layer not exceeding 20 cm in depth incuding spreading rolling ,watering and compacting in with power road roller 8 to 10 ton power capacity road roller complete job
Centring and shuttermg including strutting, propping etc. and removal of form for· Foundations: footings, bases of columns etc. for mass concrete
Extraction , transportation and Labur of Wood for making Shelter Shed complete job as per directed by the site incharge Engage 3 Carpenter for 20 days for making Shelter Shed
Extraction , transportation and Labur of Wood for making Shelter Shed complete job as per directed by the site incharge Engage 9 Labour for 20 days for making Shelter Shed
Providing and fixing of Nails
Providing corrugated Colour Coated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required 0.63mm thick with zinc coating not less than 275 gram/m2 including all leads lift carriage complete job
Providing ridges or hips of width 60cm overall width plain G.S. sheets fixed with polymer coated J. or L hooks, bolts and nuts 8mm dia G.I. limpet and bitumen washers complete0.50 mm thick with zinc coating not less than 275 gram/m2
Cement concrete flooring 1:2:4 ( 1 cement: 2 coarse sand . : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. 50 mmthick with 20mm nominal size stone aggregate. (a) Crushed
Carriage of materials from source to site of work by M.T.Sand av. 40 KM and HL 10 Km
Carriage of materials from source to site of work by Bajri av. 40 KM and HL 10 Km
Carriage of materials from source to site of work by Cement av. 40 KM and HL 10 Km
SAFEENA BEGUM (BID ID -2593745)
MAQBOOL HUSSAIN MALIK & SONS (BID ID -2597047)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .