Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | ₹1.8 L | L1 | Admitted-Finance |
| 2 | L2₹1.8 L+₹1,926.73 (1.08%)Admitted-Finance | ₹1.8 L+₹1,926.73 (1.08%) | L2 | Admitted-Finance |
| 3 | L3₹1.8 L+₹3,752.53 (2.10%)Admitted-Finance | ₹1.8 L+₹3,752.53 (2.10%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NANDHINI AND CO L3 | SVM Construction L1 | R.TAMILMANI, MRT CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.001) Renavatation of Girls Toilet Panchayat Union Middle School @ Mamanji H/O Thumbal | ||||||
| 2.00 | Earthwork excavation and depositing on bank with an intial lead & lift in hard stiff clay, gravelly soil, shales, murrams earth mixed soil as per SS 20 B for foundation | 1.27 | Cu.m | 24.6 ₹31.24 Lowest | 260 ₹330.2 | 265 ₹336.55 |
| 3.00 | Dismandling W-0021 Removal of Cut Stone Slabs / RCC Cover Slabs.,completea | 3.75 | Cu.m | 100 ₹375 Lowest | 545 ₹2,043.75 | 548 ₹2,055 |
| 4.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 2.3 | Cu.m | 6,080 ₹13,984 Lowest | 6,100 ₹14,030 | 6,200 ₹14,260 |
| 5.00 | Plastering with CM 1:5 mix using 12 mm thick for sides including cost & conveyance and labour charges etc complete | 69.5 | Sqm | 250 ₹17,375 Lowest | 275 ₹19,112.5 | 280 ₹19,460 |
| 6.00 | Supply & Fabrication of steel including all cost and conveyance of all materials to site and all labour charges for etc., complete. | 0.04 | MT | 89,000 ₹3,738 | 87,000 ₹3,654 Lowest | 87,500 ₹3,675 |
| 7.00 | Supplying and erecting centering shuttering including all cost and conveyance of all materials to site and all labour charges for etc., complete. | 3.76 | Sqm | 556 ₹2,090.56 | 540 ₹2,030.4 Lowest | 547.5 ₹2,058.6 |
| 8.00 | Reinforced Cement Concrete 1:1.5:3 mix using 20 mm metal for all items including cost & conveyance and labour charges etc complete. | 0.42 | Cu.m | 9,300 ₹3,906 | 6,900 ₹2,898 Lowest | 7,000 ₹2,940 |
| 9.00 | Special Ceiling Plastering with CM 1:3 mix using 10 mm thick including cost & conveyance and labour charges etc complete. | 7.5 | Sqm | 312 ₹2,340 Lowest | 325 ₹2,437.5 | 330.59 ₹2,479.43 |
| 10.00 | Supply and fixing of steel dôors of size 0.750 x 1.5m-2 No, including all cost and conveyance of all materials to site and all labour charges for etc., complete.Door ( D) 0.75x1.50m | 1 | Each | 4,500 ₹4,500 | 3,400 ₹3,400 Lowest | 3,500 ₹3,500 |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
6 Aug 2026, 3:00 pmClosed
BDO(VP)
BDO, Office, P.N.Palayam
Renavatation of Girls Panchayat Union Middle School at Mamanji H/o Thumbal Panchayat in P.N.Palayam Block In Salem District General Fund - 2026-27
2026_RDTN_686154_2
Roc.No.1915/2026/A3
Open Tender
Civil Works
Item Wise
120 days
BDO, Office, P.N.Palayam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,000
8 Aug 2026
16 Jul 2026
6 Aug 2026
16 Jul 2026
6 Aug 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1) Renavatation of Girls Toilet Panchayat Union Middle School @ Mamanji H/O Thumbal | - | - | - | - |
| 2 | Earthwork excavation and depositing on bank with an intial lead & lift in hard stiff clay, gravelly soil, shales, murrams earth mixed soil as per SS 20 B for foundation | - | Cu.m | - | - |
| 3 | Dismandling W-0021 Removal of Cut Stone Slabs / RCC Cover Slabs.,completea | - | Cu.m | - | - |
| 4 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 1 | Cu.m | - | - |
| 5 | Plastering with CM 1:5 mix using 12 mm thick for sides including cost & conveyance and labour charges etc complete | - | Sqm | - | - |
| 6 | Supply & Fabrication of steel including all cost and conveyance of all materials to site and all labour charges for etc., complete. | - | MT | - | - |
| 7 | Supplying and erecting centering shuttering including all cost and conveyance of all materials to site and all labour charges for etc., complete. | 1 | Sqm | - | - |
| 8 | Reinforced Cement Concrete 1:1.5:3 mix using 20 mm metal for all items including cost & conveyance and labour charges etc complete. | 1 | Cu.m | - | - |
| 9 | Special Ceiling Plastering with CM 1:3 mix using 10 mm thick including cost & conveyance and labour charges etc complete. | - | Sqm | - | - |
| 10 | Supply and fixing of steel dôors of size 0.750 x 1.5m-2 No, including all cost and conveyance of all materials to site and all labour charges for etc., complete.Door ( D) 0.75x1.50m | - | Each | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
02.pdf
Tender Documents • 1.26 MB
BOQ_824828.xls
BOQ • 0.29 MB
date.pdf
PDF • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .