Tender Value
₹2.0 L
EMD Value
₹3,950
Closing Date
13 Jul 2026, 5:00 pm5d left
Jagmal
DIV 1 Rohtak
A/mtc of Sewerage Schme in Sector-27 (Udaar Gagan Area), U/E, Rohtak for the year 2025-26
2026_HBC_534101_1
20268F53F69C CCBE 4A0B 9CBE 5F6A4532D003267HSV
Open Tender
Civil Works
30 days
Rohtak
As per approved DNIT/NIT/CBD
2 documents required · 2 mandatory
₹250
₹3,950
Yes
7 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
13 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [14.51.1]Hire charges for Hydraulic excavator/Loader like JCB/Pock lain, Hitachi etc with all accessories having bucket capacity 1. Hire Charges forJCB with bucket capacity of 0.4 cum | 5 | Per day | 6,493 | ₹32,465 |
| 2 | [20.91]Providing and Lowering 225 mm outer dia UPVC pipe threaded (10kg/CM2) duly ISI marked IS Code 12818:1992 complete in all respect as per directions of Engineer-in-charge | 95 | Metre | 1,264 | ₹1,20,080 |
| 3 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 4 | cum | 4,374 | ₹17,496 |
| 4 | [6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars | 400 | Kg. | 68 | ₹27,200 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_613185.xls
BOQ • 0.34 MB
AD0170579.pdf
Additional Documents • 1.48 MB
Download all tender documents and submit your bid