Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.6 Cr
EMD Value
₹7.3 L
Closing Date
12 Nov 2026, 2:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
OA/2
16 conditions · 4 needing a document upload
Financial Eligibility Criteria: Advance Correction Slip No. 1) Ref: 2022/ce- i/ct/gcc-2022/policy dated- 14.07.2022) A. Para 10.2., Part I of GCC shall be read as under: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover under: Financial Eligibility Criteria: Advance Correction Slip No. 1) Ref: 2022/ce-i/ct/gcc-2022/policy dated- 14.07.2022) A. Para 10.2., Part I of GCC shall be read as under: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover under: The tenderers shall submit requisite information as per Annexure-XIV (as per tender document & NIT), along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Similar Nature of work: "Any Civil engineering work comprising of construction of any type of bridge/bridge jacketing work."
16 conditions · 4 needing a document upload
A . Documents to be uploaded only in the website by the Tenderer Following Annexures duly filled and signed are to be uploaded online only prior to Closing of Tender. Original copy of all the documents to be submitted to office within 7 days whenever demanded by the Railway. Annexures are available at Upload/View Document menu in Home Page of IREPS portal for works tender. 1. The details of the works completed by the tenderer during the last Seven years to be filled in Annexure-I. 2. The details of Plants and Machinery with the tenderer to be filled in Annexure- II. 3. Details of Personnel and Organization of the Tenderer to be filled in Annexure-III. 4. Details of Works presently on hand of the Tenderer to be filled in Annexure- IV. 5. The details regarding Association of Railway Officer s with the tenderer to be filled in Annexure- V. 6. List of the Arbitration cases of the Tenderer during last Five years to be filled in Annexure-VI. 7. List of the Court cases of the Tenderer during last Five years to be filled in Annexure- VII. 8. NEFT MANDATE FORM. All Payments to the agency including the refund of the Earnest Money of the unsuccessful bidder preferably will be remitted through NEFT. The Tenderer is required to submit Bank details and A/C No. etc. in Annexure-VIII. 9.Format for Certificate to be uploaded by Tenderer Along with the tender documents Annexure-IX and IX-A (As per GCC-2022 Annexure-V and V-A). 10. GST COMPLAINT INVOICE Annexure-X 11. LETTER OF CREDIT Annexure-XI, 12. Bid Capacity Declaration Annexure-XII.13. Bid Security declaration Annexure-XIII and 14. Annual Contractual Turnover Data Declaration Annexure-XIV (As per GCC-2022 Annexure-VI-B).
B . T h e tender offer complete in a l l respect and with all documents is t o b e submitted online by e-tendering process through the website www.ireps.gov.in before the closing time/date of this tender as mentioned in the NIT (Notice Inviting Tender). Tenderer can revise the bids any number of times till the closing time/date of the tender. No manual offers shall be accepted.
Demand for the Financial Criteria, Association of Railway Officers, List of Arbitration cases, Court cases and Mandate for NEFT are to be uploaded with a scanned copy duly filled in and signed as per annexure no. IV, V, VI, VII, VIII respectively. These Annexures are available in View Document menu at Home page and is downloadable. The details of the uploaded documents should be produced whenever demanded for verification on written request at any point of time of the tender and contract within 7 days.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Strengthening of Br. including cement grouting, ballast guard wall etc (Br no 43,48,49,55, 60,63, 67, 74, 75, 91, 93,97,107,115 of HBC line) under AEN/DKAE.
268_2026-27~ER
268_2026-27
Open
Works - General
12 Months
Howrah, West Bengal
₹0
₹7.3 L
16 Oct 2026
16 Oct 2026
29 Oct 2026
93 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 2,94,09,571.56 | ||
| — | 391.00 | — | — | ||
| EARTH WORK // General // Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. // All kinds of soil | — | — | — | 62,462.25 | |
| — | 188.00 | — | — | ||
| EARTH WORK // General // Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. // All kinds of soil | — | — | — | 21,454.56 | |
| — | 1652.00 | — | — | ||
| EARTH WORK // General // Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. // All kinds of soil | — | — | — | 50,774.22 | |
| — | 130.00 | — | — | ||
| EARTH WORK // General // Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | — | — | — | 2,48,478.75 | |
| — | 4505.00 | — | — | ||
| EARTH WORK // General // Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | — | — | — | 71,359.2 | |
| — | 60.00 | — | — | ||
| CONCRETE WORK // CEMENT CONCRETE (CAST IN SITU) // Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : // 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | — | — | — | 4,25,439 | |
| — | 282.00 | — | — | ||
| CONCRETE WORK // CEMENT CONCRETE (CAST IN SITU) // Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : // 1:1 1/2:3 (1 Cement: 1 1/2 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | — | — | — | 21,16,907.73 | |
| — | 78.00 | — | — | ||
| CONCRETE WORK // CEMENT CONCRETE (CAST IN SITU) // Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : // 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | — | — | — | 5,12,087.94 | |
| — | 355.00 | — | — | ||
| REINFORCEMENT CEMENT CONCRETE // DESIGN MIX CONCRETE // Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: // All works upto plinth level // Concrete of M25 grade with minimum cement content of 330 kg /cum | — | — | — | 30,36,767.63 | |
| — | 56.00 | — | — | ||
| REINFORCEMENT CEMENT CONCRETE // DESIGN MIX CONCRETE // Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: // All works above plinth level upto floor V level // Concrete of M25 grade with minimum cement content of 330 kg /cum | — | — | — | 4,96,964.16 | |
| — | 82.00 | — | — | ||
| REINFORCEMENT CEMENT CONCRETE // DESIGN MIX CONCRETE // Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: // All works upto plinth level // Concrete of M55 grade with minimum cement content of 370 kg /cum | — | — | — | 7,23,734.46 | |
| — | 304.00 | — | — | ||
| REINFORCEMENT CEMENT CONCRETE // DESIGN MIX CONCRETE // Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: // All works above plinth level upto floor V level // Concrete of M35 grade with minimum cement content of 370 kg /cum | — | — | — | 27,80,418.96 | |
| — | 676.00 | — | — | ||
| REINFORCEMENT CEMENT CONCRETE // FORM WORK // Centering and shuttering including strutting, propping etc. and removal of form for // Foundations, footings, bases of columns, etc. for mass concrete | — | — | — | 2,38,584.06 | |
| — | 750.00 | — | — | ||
| REINFORCEMENT CEMENT CONCRETE // FORM WORK // Centering and shuttering including strutting, propping etc. and removal of form for // Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | — | — | — | 5,68,687.5 | |
| — | 82.00 | — | — | ||
| CONCRETE WORK // CEMENT CONCRETE PRECAST // Providing and fixing up to floor five level precast cement concrete string or lacing courses, copings, bed plates, anchor blocks, plain window sills, shelves, louvers, steps, stair cases, etc., including hoisting and setting in position with cement mortar1:3 (1 Cement : 3 coarse sand), cost of required Centering complete. // 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20mm nominal size derived from natural sources) | — | — | — | 7,45,756.38 | |
| — | 94.00 | — | — | ||
| REINFORCEMENT CEMENT CONCRETE // PRE-CAST RCC // Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | — | — | — | 8,95,567.14 | |
| — | 4505.00 | — | — | ||
| FINISHING // CEMENT PLASTER (IN COARSE SAND) // 12 mm cement plaster of mix : // 1:6 (1 cement: 6 coarse sand) | — | — | — | 13,93,328.93 | |
| — | 376.00 | — | — | ||
| FINISHING // 6 mm CEMENT PLASTER // Neat cement punning. | — | — | — | 27,055.08 | |
| — | 113.00 | — | — | ||
| MASONRY WORK // General // Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: // Cement mortar 1:4 (1 cement : 4 coarse sand) | — | — | — | 7,49,595.1 | |
| — | 6008.00 | — | — | ||
| FINISHING // EXTERIOR FINISHING // Finishing walls with water proofing cement paint of required shade : // New work (Two or more coats applied @ 3.84 kg/10 sqm) | — | — | — | 6,32,101.68 | |
| letter per cm height | per | — | — | ||
| — | 1943.00 | — | — | ||
| FINISHING // EXTERIOR FINISHING // Lettering with black Japan paint of approved brand and manufacture | — | — | — | 10,754.5 | |
| — | 72428.61 | — | — | ||
| REINFORCEMENT CEMENT CONCRETE // STEEL REINFORCEMENT // Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. // Thermo-Mechanically Treated bars of grade Fe-500D or more. | — | — | — | 70,30,283.03 | |
| — | — | — | 62,92,155.9 | ||
| — | 4505.00 | — | — | ||
| Hour | HP | — | — | ||
| Dewatering of natural or accumulated water from any location. Payment to be done for Horse power of pump multiplied by pumping hours. | — | — | — | 2,02,589.85 | |
| — | 2628.00 | — | — | ||
| Providing and inserting nipples of size 12 to 20 mm dia. with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary after completion of grouting. | — | — | — | 1,97,757 | |
| — | 6008.00 | — | — | ||
| Grouting of masonry/concrete by injection process duly Sealing of cracks, through nipples complete as per Technical Specification and procedure given in IRBM Para No 209 including necessary admixture. Payment shall be as per use of cement by weight in case of neat cement/cement mortar grouting and weight of Epoxy in case of Epoxy Grouting. (Cement will be paid extra). Neat Cement Grout with 20% anti shrinkage compound w.r.t. cement. | — | — | — | 24,08,787.44 | |
| — | 376.00 | — | — | ||
| Providing and fixing of Drainage Spouts of 110mm UPVC Type A ISI marked (Working pressure 4 kg/sqcm) using suitable clamps and adhesive etc., complete. | — | — | — | 1,44,451.68 | |
| — | 113.00 | — | — | ||
| Painting the HFL mark and Danger level mark, year of HFL on bridge abutments and piers with ready mixed paint as per standard in two coats over one coat of primer with all materials, labour, tools, scaffolding, all lead and lift etc. including writing complete. | — | — | — | 36,108.02 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
LetterregardingrecommendedlistofBrands_makeofmaterialsdated03.09.2025.pdf
ATTACHMENT
Updatedtenderdocument_151.pdf
ATTACHMENT
GCCACS14.07.2022-compressed.pdf
ATTACHMENT
CheckList_3.pdf
ATTACHMENT
JPOSTCables_1.pdf
ATTACHMENT
Annexure-X2.pdf
ATTACHMENT
NewAnnexure-IX-merged.pdf
ATTACHMENT
Annexure-XII_.pdf
ATTACHMENT
ColouredFinal_GCC_April-22_pdf_27.04.22_1.pdf
ATTACHMENT
Annexure-XI_11_2.pdf
ATTACHMENT
Annexure-XIV_1.pdf
ATTACHMENT
Annexure-IIIIII_3.pdf
ATTACHMENT
ACS11GCCWorks2026.pdf
ATTACHMENT
Annexure-IVVVIVIIVIII_2.pdf
ATTACHMENT
Annexure-XIII_1.pdf
ATTACHMENT
Specialconditionforjacketingwork.pdf
ATTACHMENT
2ndcorrectionslip.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_5ACS-5.pdf
ATTACHMENT
GCC-2022-ACS7.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .