Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20.3 LAccepted-AOC PUDHUCHATRAM NAMAKKAL | PUDHUCHATRAM | NAMAKKAL | TAMIL NADU | ₹20.3 L | 1 | Accepted-AOC L1 |
| 2 | 2₹20.5 LRejected-AOC KOLUTHUOPALAYAM NAMAKKAL | NAMAKKAL | NAMAKKAL | TAMIL NADU | ₹20.5 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | DURAI CONTRACTOR L2 | ESS and Co L1 |
|---|---|---|---|---|---|
| 1.00Kanurpatty - Edayapatty road to Vayakkadu Burial ground road km 0/0 - 0/500 R-360 | |||||
| 2.00Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers. | |||||
| 3.00 | Km 0/000-0/500 | 1,200 | Sqm | 10 ₹12,000 | 5 ₹6,000 |
| 4.00Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | |||||
| 5.00 | Km 0/000-0/500 | 493.75 | Sqm | 35 ₹17,281.25 | 23.36 ₹11,534 |
| 6.00Collection and Supply of Gritty Gravel with an Average Lead of 1K.M including Cost and conveyance and stacking and Spreading Charges etc., complete. | |||||
| 7.00 | Km 0/000-0/500 | 65 | Cum | 341.29 ₹22,183.85 | 341.29 ₹22,183.85 |
| 8.00Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Plant Mix method) | |||||
| 9.00 | Km 0/000-0/500 | 41.25 | Cum | 2,479.59 ₹1.0 L | 2,479.59 ₹1.0 L |
| 10.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
Tender Value
Refer Docs
EMD Value
₹20,900
Closing Date
25 Feb 2026, 3:00 pmClosed
The Project Director
DRDA Namakkal
Strengthening of 1 Road works in Puduchatram Block of Namakkal District under MGSMT CGFandSFC 2025-26 Pkg.No.32/MGSMT/25-26
2026_RDTN_660899_32
3468/2024/A8
Open Tender
Civil Works - Roads
Puduchatram
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹20,900
9 Mar 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
25 Feb 2026
20 Feb 2026
Kanurpatty - Edayapatty road to Vayakkadu Burial ground road km 0/0 - 0/500 R-360
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Collection and Supply of Gritty Gravel with an Average Lead of 1K.M including Cost and conveyance and stacking and Spreading Charges etc., complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Plant Mix method)
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Road Making with Hot Applied Thermoplastic Compound with reflectorising Glass Beads on Bitumen Surface
Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet
Supply and Fixing of H.M Stones etc.,
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
32.pdf
Tender Documents • 1.64 MB
BOQ_793191.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid