Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹2.1 L Construction of Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH:- Operation of DG set at CPWD site office, IIT Jagti, Jammu. | Construction of Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH:- Operation of DG set at CPWD site office, IIT Jagti, Jammu. | L1 | |
| 2 | L2₹2.1 L+₹516.90 (0.25%) Construction of Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH:- Operation of DG set at CPWD site office, IIT Jagti, Jammu. | Construction of Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH:- Operation of DG set at CPWD site office, IIT Jagti, Jammu. | L2 | |
| 3 | L3₹2.1 L+₹1,723.02 (0.83%) Construction of Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH:- Operation of DG set at CPWD site office, IIT Jagti, Jammu. | Construction of Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH:- Operation of DG set at CPWD site office, IIT Jagti, Jammu. | L3 | |
| 4 | L4₹2.1 L+₹2,649.15 (1.27%) Construction of Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH:- Operation of DG set at CPWD site office, IIT Jagti, Jammu. | Construction of Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH:- Operation of DG set at CPWD site office, IIT Jagti, Jammu. | L4 | |
| 5 | - | - |
| Sl No | Description | Qty | Unit | M/s New Star Air Conditioner L3 | Rishav Plah L1 | Shakeel Ahmed Lone L2 | M/s Chib Constructions L4 |
|---|---|---|---|---|---|---|---|
| 1 | Operation of DG set at CPWD site office, IIT Jagti, Jammu | - | - | -2.5 ₹2,09,993.55 | -3.3 ₹2,08,270.53 Lowest | -3.06 ₹2,08,787.43 | -2.07 ₹2,10,919.68 |
Tender Value
₹2.2 L
EMD Value
₹4,308
Closing Date
10 Oct 2025, 3:00 pmClosed
EE&SM(E )-1
Chaman lal
CE cum ED (IIM and IIT Jammu Project), CPWD, Jammu
Construction of Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH:- Operation of DG set at CPWD site office, IIT Jagti, Jammu.
128305
04/NIT/EE&SM(E)/(IIM&IIT) JPED/2025-26
OPEN
Electrical Works
NCB
6 months
Jammu, Jammu And Kashmir
10 documents required · 10 mandatory
₹4,308
Not Applicable
10 Oct 2025
26 Sept 2025
10 Oct 2025
10 Oct 2025
2 Oct 2025
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT.pdf
document • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .