| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-AOC | ₹24.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹25.0 L+₹3,495.98 (0.14%)Rejected-Finance | ₹25.0 L+₹3,495.98 (0.14%) | L2 | Rejected-Finance L2 |
Tender Value
₹29.5 L
EMD Value
₹58,940
Closing Date
30 May 2026, 12:00 pmClosed
EERED RBL
SONIA NAGAR RAEBARELI
LOT NO 14 VIKAS KHAND UNCHAHAR KE SAADHAN SAMAITI DHANIYE SARENI SE PURE BAISAN KA PURWA TAK DAMARIKARAN KARYA
2026_REDUP_1147726_14
360/EE/RED/RBLDT29.04.2026
Open Tender
Civil Works
Percentage
90 days
UNCHAHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
₹58,940
Yes
18 Jul 2026
18 May 2026
30 May 2026
18 May 2026
30 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
| - | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 20 | 1,500 | cum | 0.95 | ₹1,425 |
| 3 | Construction of subgrade with Material obtained from borrow pits of Lokal earth Construction of Embankment with approved Material obtained from abaiable land and permitted and approved by E/I and as per technical specification clause 301.3.4.1 with all Lift and Lead,spreading,Grading to required slope and copacting to meet requirment of tables 300 .1 aad 300.2 as per tech classification 301.5 3 Km Cortage from site. | 1,042.5 | cum | 98.52 | ₹1,02,707.1 |
| 4 | Construction of Subgrade and Earthen Shoulder with approved soil with all lifts and leads, laying in layers, breaking clods, dressing to requierd lines, curves, grads and sections, watering and compaction to meet at least 100 % procter density complete to specification requirements. | 405 | cum | 88.45 | ₹35,822.25 |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density complete as per technical specification clause 401 | 187.5 | cum | 2,563.1 | ₹4,80,581.25 |
| 6 | Providing, Laying,Spreding and Compacting Stone aggregates of Specific Sizes to Water Bound Macadam specification i/c Spreding in Uniform thickness, hand Packing,Rolling with Three Wheel 80-100 Kn.Static Roller in Stages to Proper Grade and Camber Applying Stone Screenig,Binding Materials to Fill up the Intersticks of Coarse Aggregate,Watering and Compacting to the Required Density Grade-2 as per technical specification clause 405 | 140.63 | cum | 3,723.05 | ₹5,23,572.52 |
| 7 | Providing,Leying,Spreding and compacting Stone Aggregates of Specific sizes to Water Bound Macadam Specification i/c Spreding in Uniform thickness,Hand Packing, Rolling with Three Wheel 80-100 KN Static Roller in stages to Proper Grade and camber Applying and Brooming Stone Screening to Fill up the intersticks of Coarse aggregate, Watering and Compacting to the Required Density Grade-3. as per technical specification clouse 405 | 140.63 | cum | 3,846.55 | ₹5,40,940.33 |
| 8 | Brick edging on both side of brick class M- 15 with 8 Cm. wide & 12 Cm. deep laid with mud mortar including all complete. As Per SOR S.I.N0. 765. | 1 | KM | 69,880.22 | ₹69,880.22 |
| 9 | Providing and Applying Primer Coat with Bitumen Emulsion ( SS-1) on Prepared Surface of Granular Base including Cleaning of road Surface and spraying primer at the rate of 0.70 Kg./Sqm. Using Mechanical Means As Per Technical Specification Clause 502. | 1,875 | M2 | 63.65 | ₹1,19,343.75 |
| 10 | Providing and Applying Tack Coat with Maxfalt VG-10 Using Bitumen distributor at the Rate of 0.25 to 0.35 Kg. Per Sqm on the Prepared bituminous surface cleaned with Hydaulic Broom As Per Technical Specification Clause 503. | 1,875 | M2 | 20.62 | ₹38,662.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.14 MB
BOQ_2147766.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .