Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC HIMACHAL PRADESH | L1 | Accepted-AOC Accept | |
| 2 | L2₹7.9 L+₹10,093.44 (1.30%)Rejected-AOC | L2 | Rejected-AOC Accept | |
| 3 | L3₹8.3 L+₹48,522.88 (6.23%)Rejected-AOC HOUSE NO 114 WARD NO 1 KRISHNA NAGAR TEH AND DISTT HAMIRPUR H P | L3 | Rejected-AOC Accept |
Tender Value
₹7.6 L
EMD Value
₹15,200
Closing Date
24 May 2021, 10:30 amClosed
Executive Engineer, Bhoranj Division, HP.PWD., Bho
Executive Engineer Bhoranj Division HP.PWD. Bhoranj
C.O link road to village Balokhar Distt. Hamirpur H.P. SH.PL 20 mm thick premix in Km. 0.0 to 0.700
2021_PWD_47334_1
C/O link road to village Balokhar JOB NO 2
Open Tender
Civil Works - Roads
Item Rate
90 days
BHORANJ
Please refer Tender documents.
19 documents required · 19 mandatory
₹350
Yes
₹15,200
Yes
25 Sept 2021
10 May 2021
24 May 2021
10 May 2021
24 May 2021
10 May 2021
Amount
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications On W.B.M. @ 0.75 Kg / sqm as per direction of Engineer- in -Charge, including entire carriage of materials in all leads and lifts and other incidentals. The rates are inclusive octori, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government.
2 cm premix carpet surfacing with 1.8 cum and 0.90 cumof stone chippings of 13.2 mm size and 11.2 mm sizerespectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hotstraight run bitumen, including consolidation with roadroller of 6 to 9 tonne capacity etc. complete (tack coat tobe paid for separately).With paving Asphalt grade VG - 10 heated and then mixed with solvent at the rate of 70 grams per kg of asphalt as per direction of Engineer- in -Charge, including entire carriage of materials in all leads and lifts and other incidentals. The rates are inclusive octori, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government.
Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG - 10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface,including rolling and finishing with road roller all complete as per direction of Engineer- in -Charge, including entire carriage of materials in all leads and lifts and other incidentals. The rates are inclusive octori, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government.
Providing and laying spreading and compacting stone aggregate of specific size to water bound macadam spedification including spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone scseening/binding material to fill up the interstices of course aggregate watering and compacting to the required density grading-III as per technical specification clause 405 by manual means, as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals.The rates are inclusive octori, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government.
ashok Thakur
Praveen Thakur
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .