Staff Officer (Civil) KA
Office of the Area General Manager, Dungariya, Kanhan Area
Repairing of collapsed boundary wall at VTC Sukri under GM Unit of Kanhan Area
2026_WCL_366782_1
ka3450-civ-s-e016 of 2026-27
Open Tender
Civil Works - Others
Percentage
30 days
VTC Sukri under GM Unit
-----N.A.------
3 documents required · 3 mandatory
₹3,600
9 Oct 2026
9 Oct 2026
22 Oct 2026
10 Oct 2026
21 Oct 2026
10 Oct 2026
10 Oct 2026 - 17 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 160 | Sqm | 30.9 | ₹4,944 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 9.6 | Cum | 188.5 | ₹1,809.6 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 1.55 | Cum | 5,052.05 | ₹7,830.68 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources). | 5 | Cum | 6,652.05 | ₹33,260.25 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Cold twisted bars | 365 | Kg | 91.7 | ₹33,470.5 |
| 6 | Brick work with clay fly ash F.P.S. (non modular) brick of class designation 3.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand). | 4 | Cum | 4,443.41 | ₹17,773.64 |
| 7 | Brick work with clay fly ash F.P.S. (non modular) brick of class designation 3.5 in superstructure above plinth level up to floor one level in: Cement mortar 1:6 (1 cement : 6 coarse sand). | 9.2 | Cum | 4,914.1 | ₹45,209.72 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 11.88 | Sqm | 260.1 | ₹3,089.99 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 20.88 | Sqm | 610.8 | ₹12,753.5 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 15.9 | Sqm | 478.5 | ₹7,608.15 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.27 MB
BOQ_379837.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .