| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.2 CrAccepted-AOC | ₹3.2 Cr | 1 | Accepted-AOC the cont agreed to reduces to his quoted rates earlier |
| 2 | 2₹3.7 Cr+₹53 L (16.7%)Rejected-Finance | ₹3.7 Cr+₹53 L (16.7%) | 2 | Rejected-Finance not lowest |
| 3 | 3₹3.7 Cr+₹53 L (16.7%)Rejected-Finance VPO MAJARI TEHSIL SHRI NAINA DEVI DISTT BILASPUR HP | ₹3.7 Cr+₹53 L (16.7%) | 3 | Rejected-Finance not lowest |
| 4 | 4₹4.1 Cr+₹90.0 L (28.3%)Rejected-Finance | ₹4.1 Cr+₹90.0 L (28.3%) | 4 | Rejected-Finance not lowest |
| 5 | Rejected-Technical V P O LOTE TEHSIL DISTT LAHAUL DISTT LAHAUL SPITI H P 175133 | LAHUL AND SPITI | HIMACHAL PRADESH | 175133 | - | - | Rejected-Technical worl done criteria not fullfilled |
Tender Value
₹3.8 Cr
EMD Value
₹4.1 L
Closing Date
14 Jul 2023, 5:00 pmClosed
Executive Engineer
Jal Shakti Division Reckong Peo
CO RCC Trench Weir, CO Desilting tank , CO water treatment plant of 2.12 MLD capacity consisting Raw water tank, Pre settling tank, inlet chamber channel, Alum solution tank,Mixing channel, Flocculator, Settling tank, Rapid sand gravity Air blower
2023_HPIPH_75980_1
KNR-JSD-PEO-EA-I-TENDER
Open Tender
Civil Works
Lump-sum
365 days
GP Reckong peo
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,500
Yes
EE Reckong Peo
₹4.1 L
Yes
29 Jan 2024
7 Jul 2023
15 Jul 2023
7 Jul 2023
14 Jul 2023
7 Jul 2023
Amount
Water Treatment Plant:-The scope of work under present tender includes the Survey , designing , construction of 2.12 MLD capacity water treatment plant of the quality specified in the basic design data to produce clear water as per the requirements of latest CPHEEO manual on water supply and treatment which include the construction of Raw water tank , Presettling Tank, Inlet channel ,outlet channel, manholes, Alum Solution Tank, Mixing Channel, Floculator, Rapid Sand Filter, Settling Tank, Backwash water Tank, Chemical House, Chamber at Filter Bed ,internal and bypass line arrangements gravity valves at filter bed,V-wire drain system, Air compressor, air blowers, Centrifugal pumps, Clear Water Tank disposal arrangements, complete prechlorination arrangement with Gaseous Chlorine etc including all works pertaining to it. Rate of filteration should be kept in between 4.8 to 6 m/hr. But with the inlet and outlet control arrangements designed to permit 100% overload for emergent occassions. also plant building for housing chemical store, landscaping , plantations,water testing laboratory with all lab equipments and furniture, plant office, toilet, water testing piping, valves, mechanical/electrical equipment, electric wiring and panel boards drainage sanitation, interconnecting paths, site development which includes cutting and retaining/breast wall up to a minimum of 3.00 mtr from edge of each unit as per design parameters and specification.
The components/ units mentioned/ Proposed above are tentative and the WTP shall comprise of but not limited to above arrangements/methodology The final decision regarding the components shall be made at the time of finalisation of the design drawings. A well-equipped laboratory of appropriate size for water testing at Reckong Peo shall be provided as per clause 15.6 of CPHEEO of water Supply & treatment. WTP shall be designed as per the specifications mentioned in Vol-2, Part-3 and CPHEEO Manual, if anything found contrary, then CPHEEO Manual shall be followed the same shall be to the entire satisfaction of Engineer-in-charge. On the completion of all civil, mechanical and electrical works, the contractor shall test run the plant for 3 months If the performance of various units of the treatment plant is as specified in NIT/CPHEEO manual, the plant shall be formally taken over by the department, otherwise, the contractor shall make necessary changes/repairs to improve the efficiency of the units/plants. Multifunction Water Quality in line Meter to record PH, TDS, DO, Turbidity, temperature of the treated water at the inlet and outlet points of WTP, meeting the control criteria. The firm / ontractor shall submit the detailed hydraulic and structural design and drawings (4 copies or as decided by Engineer-in-charge) for each component of treatment plant, which shall be approved by the department before the work is started.
HILL CONSTRUCTION AND ENGINEERING CO. SOLAN
MS Kamal Dev Sharma
gagan ohri
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .