| 1 | L1₹14.0 LAccepted-AOC 3 176 ARULJOTHI NAGAR KARANAMPETTAI SULUR VIA COIMBATORE 641401 | COIMBATORE | TAMIL NADU | 641401 | ₹14.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹14.3 LRejected-Finance | ₹14.3 L | L2 | Rejected-Finance Quated high rate |
| Sl No | Description | Qty | Unit | SRI MURUGAN CONSTRUCTIONS L1 | DHANASEKAR K L2 |
|---|---|---|---|---|---|
| 1.00Name of work: Construction of drain and culvert from P.U.Ele.School (North) to Government Hospital to link with Exisiting drain H/O KAVUNDAPADY | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 217.01 | Cum | 263 ₹57,073.63 | 275 ₹59,677.75 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 24.78 | Cum | 5,416 ₹1,34,208.48 | 5,455 ₹1,35,174.9 |
| 4.00 | Supply and erection of steel centering for RCC works Including cost and conveyance of materials and all labour charges etc complete | 478.4 | Sqm | 547.3 ₹2,61,828.32 | 565 ₹2,70,296 |
| 5.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 105.26 | Cum | 6,173 ₹6,49,769.98 | 6,215 ₹6,54,190.9 |
| 6.00 | Supply and erection of steel centering for RCC works Including cost and conveyance of materials and all labour charges etc complete | 6.28 | Sqm | 1,095 ₹6,876.6 | 1,125 ₹7,065 |
| 7.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works | 0.19 | Mts | 91,963 ₹17,472.97 | 92,150 ₹17,508.5 |
| 8.00 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 1.36 | Cum | 9,166 ₹12,465.76 | 9,275 ₹12,614 |
| 9.00 | Plastering with CM 1:4 mix 20mm thick including all cost and conveyance of materials and labour charges etc | 84.98 | Sqm | 579 ₹49,203.42 | 585 ₹49,713.3 |
| 10.00 | Provision for Name board charges | 1 | Nos | 1,500 ₹1,500 | 2,000 ₹2,000 |
Tender Value
₹14.2 L
EMD Value
₹14,200
Closing Date
28 Feb 2026, 3:00 pmClosed
Block Development Officer (V.P), Bhavani
Block Development Officer (V.P), Bhavani
Construction of drain and culvert from P.U.Ele.School (North) to Government Hospital to link with Exisiting drain H/O KAVUNDAPADY
2026_RDTN_664122_1
460/2025/A4
Open Tender
Civil Works - Others
105 days
Block Development Officer (V.P), Bhavani
Construction of drain and culvert from P.U.Ele.School (North) to Government Hospital to link with Exisiting drain H/O KAVUNDAPADY
7 documents required · 7 mandatory
₹0
₹14,200
Yes
5 Mar 2026
23 Feb 2026
28 Feb 2026
23 Feb 2026
28 Feb 2026
23 Feb 2026
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supply and erection of steel centering for RCC works Including cost and conveyance of materials and all labour charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supply and erection of steel centering for RCC works Including cost and conveyance of materials and all labour charges etc complete
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Plastering with CM 1:4 mix 20mm thick including all cost and conveyance of materials and labour charges etc
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_797397.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_797397.xls
BOQ • 0.31 MB
Tendernotice1420000.pdf
Tender Documents • 0.23 MB
Download all tender documents and submit your bid