Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 CrAdmitted-Finance | ₹10.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.8 Cr+₹4.9 L (0.46%)Admitted-Finance A 153 HQ CE EC KOLKATA LEKHAPANI POST TINSUKIA DIST ASSAM STATE | ₹10.8 Cr+₹4.9 L (0.46%) | L2 | Admitted-Finance |
| 3 | L3₹11.4 Cr+₹68.0 L (6.33%)Admitted-Finance | ₹11.4 Cr+₹68.0 L (6.33%) | L3 | Admitted-Finance |
| 4 | L4₹11.5 Cr+₹80.2 L (7.47%)Admitted-Finance | ₹11.5 Cr+₹80.2 L (7.47%) | L4 | Admitted-Finance |
| 5 | L5₹12.5 Cr+₹1.8 Cr (16.8%)Admitted-Finance L 87 STREET NO 7C MAHIPALPUR EXTENSION NEW DELHI 110037 | NEW DELHI | NEW DELHI | DELHI | 110037 | ₹12.5 Cr+₹1.8 Cr (16.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M P KHAITAN L4 | M/s Singh enterprises L2 | NARSINGH DEVELOPERS LLP L7 | SHRI GANESH ENTERPRISES L6 | MS SHRI B.C. DAS L1 | NSC Projects Pvt. Ltd. L5 | BHOWMICK ENTERPRISES (INDIA) L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE "A" Part - I (BUILDINGS/STRUCTURES WORK) Details of Buildings are given here-in-before:- | ||||||||||
| 1.10 | Construction of 01 Block of Covered accomodation for ' B' vehicle height 3.2 m in single storey configuration with RCC framed structure and permanent specification complete all as specified and as shown in drawing. | 1 | Each | 1,02,00,000 ₹1,02,00,000 | 65,00,000 ₹65,00,000 | 1,25,00,000 ₹1,25,00,000 | 85,20,000 ₹85,20,000 | 7,99,800 ₹7,99,800 Lowest | 1,09,00,000 ₹1,09,00,000 | 80,00,000 ₹80,00,000 |
| 1.20 | Construction of 01 Block of Covered accomodation for ' B' vehicle height 4.0 m in single storey configuration with RCC framed structure and permanent specification complete all as specified and as shown in drawing. | 1 | Each | 1,06,50,000 ₹1,06,50,000 | 90,00,000 ₹90,00,000 | 1,35,00,000 ₹1,35,00,000 | 85,65,000 ₹85,65,000 Lowest | 1,06,50,000 ₹1,06,50,000 | 1,23,56,000 ₹1,23,56,000 | 95,20,000 ₹95,20,000 |
| 1.30 | Construction of 01 Block of Covered accomodation for ' B' vehicle height 4.3 m in single storey configuration with RCC framed structure and permanent specification complete all as specified and as shown in drawing. | 1 | Each | 1,12,50,000 ₹1,12,50,000 | 90,00,000 ₹90,00,000 | 1,45,00,000 ₹1,45,00,000 | 1,00,00,000 ₹1,00,00,000 | 85,15,000 ₹85,15,000 Lowest | 1,32,56,000 ₹1,32,56,000 | 96,50,000 ₹96,50,000 |
| 1.40 | Construction of 01 Block of Covered accomodation for ' B' vehicle height 4.9 m in single storey configuration with RCC framed structure and permanent specification complete all as specified and as shown in drawing. | 1 | Each | 1,25,00,000 ₹1,25,00,000 | 85,00,000 ₹85,00,000 Lowest | 1,50,00,000 ₹1,50,00,000 | 1,00,00,000 ₹1,00,00,000 | 95,13,200 ₹95,13,200 | 1,32,54,000 ₹1,32,54,000 | 96,58,000 ₹96,58,000 |
| 1.50 | Construction of Sentry Post, in single storey configuration with RCC framed structure and permanent specification complete all as specified and as shown in drawing. | 2 | Each | 3,04,500 ₹6,09,000 | 3,00,000 ₹6,00,000 Lowest | 3,01,000 ₹6,02,000 | 3,06,000 ₹6,12,000 | 3,08,000 ₹6,16,000 | 3,03,000 ₹6,06,000 | 3,02,000 ₹6,04,000 |
| 2.00 | SCHEDULE "A" PART- II
(SITE CLEARENCE AND DEVELOPMENT)
Details of prepriced Schedule is given in tender documents | 1 | Lump sum | 34,50,000 ₹34,50,000 | 34,36,913 ₹34,36,913 Lowest | 34,37,000 ₹34,37,000 | 34,90,000 ₹34,90,000 | 35,65,200 ₹35,65,200 | 34,40,000 ₹34,40,000 | 34,38,000 ₹34,38,000 |
| 3.00 | SCHEDULE "A" PART- III
(INTERNAL ELECTRIFICATION)
Details of prepriced Schedule is given in tender documents. | 1 | Lump sum | 1,93,000 ₹1,93,000 | 1,90,509 ₹1,90,509 Lowest | 1,90,700 ₹1,90,700 | 1,96,000 ₹1,96,000 | 1,98,000 ₹1,98,000 | 1,91,000 ₹1,91,000 | 1,90,800 ₹1,90,800 |
| 4.00 | SCHEDULE "A" PART-IV
(ROAD/ PATH/ CULVERT)
Details of prepriced Schedule is given in tender documents. | 1 | Lump sum | 2,98,00,000 ₹2,98,00,000 Lowest | 3,00,00,000 ₹3,00,00,000 | 3,01,00,000 ₹3,01,00,000 | 4,50,00,000 ₹4,50,00,000 | 3,02,00,000 ₹3,02,00,000 | 3,01,20,000 ₹3,01,20,000 | 3,01,10,000 ₹3,01,10,000 |
| 5.00 | SCHEDULE "A" PART- V
(AREA DRAINAGE)
Details of prepriced Schedule is given in tender documents | 1 | Lump sum | 14,08,000 ₹14,08,000 | 14,02,422 ₹14,02,422 Lowest | 14,03,000 ₹14,03,000 | 14,10,000 ₹14,10,000 | 14,15,000 ₹14,15,000 | 14,06,000 ₹14,06,000 | 14,04,000 ₹14,04,000 |
Tender Value
₹10.8 Cr
EMD Value
₹8.7 L
Closing Date
20 Jun 2026, 6:00 pmClosed
CHIEF ENGINEER AF SHILLONG ZONE
HQ CHIEF ENGINEER AF SHILLONG ZONE MILITARY ENGINEER SERVICES ELEPHANT FALLS CAMP PO NONGLYER SHILLONG 793009
PROVISION OF EXTERNAL SERVICES FOR INDUCTION OF GW SYSTEM AT AF STATION MOHANBARI
2026_MES_761711_1
88691/MHB/E8
Open Tender
Civil Works
Lump-sum
545 days
Mohanbari
As per tender documents
8 documents required · 8 mandatory
₹3,000
GE (AF) MOHANBARI
₹8.7 L
Yes
17 Sept 2026
23 Apr 2026
22 Jun 2026
23 Apr 2026
20 Jun 2026
11 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | SCHEDULE "A" Part - I
(BUILDINGS/STRUCTURES WORK)
Details of Buildings are given here-in-before:- | - | - | - | - |
| - | Construction of 01 Block of Covered accomodation for ' B' vehicle height 3.2 m with Apron in single storey configuration with RCC framed structure and permanent specification complete all as specified and as shown in drawing. | - | Lump sum | - | - |
| - | Construction of 01 Block of Covered accomodation for ' B' vehicle height 4.0 m with Apron in single storey configuration with RCC framed structure and permanent specification complete all as specified and as shown in drawing. | - | Lump sum | - | - |
| - | Construction of 01 Block of Covered accomodation for ' B' vehicle height 4.3 m with Apron in single storey configuration with RCC framed structure and permanent specification complete all as specified and as shown in drawing. | - | Lump sum | - | - |
| - | Construction of 01 Block of Covered accomodation for ' B' vehicle height 4.9 m with Apron in single storey configuration with RCC framed structure and permanent specification complete all as specified and as shown in drawing. | - | Lump sum | - | - |
| - | Construction of Sentry Post, in single storey configuration with RCC framed structure and permanent specification complete all as specified and as shown in drawing. | - | Lump sum | - | - |
| - | SCHEDULE "A" PART- II
(SITE CLEARENCE AND DEVELOPMENT)
Details of prepriced Schedule is given in tender documents | - | Lump sum | - | - |
| - | SCHEDULE "A" PART- III
(INTERNAL ELECTRIFICATION)
Details of prepriced Schedule is given in tender documents. | - | Lump sum | - | - |
| - | SCHEDULE "A" PART-IV
(ROAD/ PATH/ CULVERT)
Details of prepriced Schedule is given in tender documents. | - | Lump sum | - | - |
| - | SCHEDULE "A" PART- V
(AREA DRAINAGE)
Details of prepriced Schedule is given in tender documents | - | Lump sum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Tendernotice_2.pdf
PDF • 0.44 MB
WD.rar
Additional Documents • 7.36 MB
Tender.pdf
Tender Documents • 2.86 MB
TD.rar
Additional Documents • 21.42 MB
BOQ_853228.xls
BOQ • 0.81 MB
Corrigendum_3d.pdf
PDF • 0.19 MB
Corrigendum_3R.pdf
PDF • 2.01 MB
Corrigendum_3.pdf
PDF • 0.15 MB
Corrigendum_2.pdf
PDF • 0.15 MB
Corrigendum_1r.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .