Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.5 LAccepted-AOC NA | NA | NA | 121004 | ₹23.5 L | 1 | Accepted-AOC AOC |
| 2 | 2₹25.3 LRejected-Finance | ₹25.3 L | 2 | Rejected-Finance Not Being Lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical Particular document incomplete |
| 4 | Rejected-Technical | - | - | Rejected-Technical Particular document incomplete |
| Sl No | Description | Qty | Unit | M/S Sushila Enterprises L1 | M/s Sanika Construction L2 |
|---|---|---|---|---|---|
| 1.00 | Dewatering for proper execution of work i/c cost of all material, T&P, machines, labour etc complete in all as per direction of Engineer in charge. | 200 | Job | 405.09 ₹81,018 | 445 ₹89,000 |
| 2.00 | Removal of slush from suction tank & intake channel including all lead and lift, cost of all material, T&P, machines, labour etc complete in all for proper completion of work as per direction of Engineer in charge. | 599.4 | M3 | 157.54 ₹94,429.48 | 165 ₹98,901 |
| 3.00 | Excavation of foundation in parwa soil i/c lift up to 1.5 m and lead up to 30 m i/c fiiling watering ramming of excavated earth into the tranches or up to the space & side of the foundation trenches or into the plinth & removal & disposal of sarplus earth as directed by engineer in charge. up to a distance of 30 m from the foundation trenches. | 157.6 | M3 | 103.52 ₹16,314.75 | 110 ₹17,336 |
| 4.00 | P/Laying local sand including all labour and T&P Required for completion of work. | 5.19 | M3 | 1,395.31 ₹7,241.66 | 1,550 ₹8,044.50 |
| 5.00 | P.C.C 1:4:8 in 20-40 mm gauge stone grit in raft, wall foundation, including all lead & lift, curing, all labour,T&P etc required for proper completion of work as per direction of Engineer in charge. | 70.97 | M3 | 4,050.9 ₹2.9 L | 4,200 ₹3.0 L |
| 6.00 | Providing & laying TMT steel for reinforcement including cost of material, labour for cutting, bending placing in position & binding with G.I. wire i/c all T&P required for proper completion of work as per direction of Engineer in charge. | 10.57 | MT | 64,814.4 ₹6.9 L | 71,000 ₹7.5 L |
| 7.00 | Centering & shuttering for coloumn and side wall i/c all material, labour T&P etc. required for proper as per direction of Engineer in charge. | 729.71 | M2 | 281.58 ₹2.1 L | 312 ₹2.3 L |
| 8.00 | RCC 1:2:4 CM in 10-20 mm stone grit including curing,all labour,T&P all lead & lift etc required for proper completion of work as per direction of Engineer in charge. | 188.13 | M3 | 4,951.1 ₹9.3 L | 5,300 ₹10.0 L |
| 9.00 | Poviding and laying of Dumbell type Water stopper Rubber seal i/c labour for completion of work. | 77 | Rmt | 333.07 ₹25,646.39 | 350 ₹26,950 |
| 10.00 | Providing and mixing of air entraining agent @ 1.0 ltr/M³ | 188.13 | Ltr | 99.02 ₹18,628.63 | 105 ₹19,753.65 |
Tender Value
₹26.3 L
EMD Value
₹53,000
Closing Date
2 Jun 2025, 12:00 pmClosed
EXECUTIVE ENGINEER LIFT CANAL DIVISION JHANSI
OFFICE OF THE EXECUTIVE ENGINEER LIFT CANAL DIVISION Gwalior Road Civil Lines Jhansi
Repairing of Suction Tank of Badagaon Pump Canal situated at Left Bank of Betwa River at Block Badagaon Chirgaon District Jhansi
2025_UPIDM_1042724_1
03/LCDJ/EE/2025-26
Open Tender
Civil Works
120 days
Badagaon Jhansi
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹53,000
Jhansi
15 Dec 2025
26 May 2025
2 Jun 2025
26 May 2025
2 Jun 2025
26 May 2025
27 May 2025
Amount
Dewatering for proper execution of work i/c cost of all material, T&P, machines, labour etc complete in all as per direction of Engineer in charge.
Removal of slush from suction tank & intake channel including all lead and lift, cost of all material, T&P, machines, labour etc complete in all for proper completion of work as per direction of Engineer in charge.
Excavation of foundation in parwa soil i/c lift up to 1.5 m and lead up to 30 m i/c fiiling watering ramming of excavated earth into the tranches or up to the space & side of the foundation trenches or into the plinth & removal & disposal of sarplus earth as directed by engineer in charge. up to a distance of 30 m from the foundation trenches.
P/Laying local sand including all labour and T&P Required for completion of work.
P.C.C 1:4:8 in 20-40 mm gauge stone grit in raft, wall foundation, including all lead & lift, curing, all labour,T&P etc required for proper completion of work as per direction of Engineer in charge.
Providing & laying TMT steel for reinforcement including cost of material, labour for cutting, bending placing in position & binding with G.I. wire i/c all T&P required for proper completion of work as per direction of Engineer in charge.
Centering & shuttering for coloumn and side wall i/c all material, labour T&P etc. required for proper as per direction of Engineer in charge.
RCC 1:2:4 CM in 10-20 mm stone grit including curing,all labour,T&P all lead & lift etc required for proper completion of work as per direction of Engineer in charge.
Poviding and laying of Dumbell type Water stopper Rubber seal i/c labour for completion of work.
Providing and mixing of air entraining agent @ 1.0 ltr/M³
M/s Sanika Construction (BID ID -5229931)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid