Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.5 LAccepted-AOC NO 422 CHURCH STREET NEW THIPPASANDRA BANGALORE 560075 | BANGALORE | BANGALORE | KARNATAKA | 560075 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹64.9 L+₹62,984 (0.98%)Rejected-AOC SR NO 281 3 7 ANAND NAGAR NEAR DHANORI JAKAT NAKA LOHEGAON PUNE 411047 | PUNE | PUNE | MAHARASHTRA | 411047 | L2 | Rejected-AOC Not Being lowest | |
| 3 | L3₹66.6 L+₹2.3 L (3.52%)Rejected-AOC D 16 OF HQ ADG P CHENNAI PLOT NO 97 SANTOSH NAGAR BALAJI NAGAR NEAR CURRENT OFFICE MEDCHAL MALKAJGIRI TELANGANA 500087 | MEDCHAL MALKAJGIRI | TELANGANA | 500087 | L3 | Rejected-AOC Not Being lowest | |
| 4 | L4₹66.9 L+₹2.5 L (3.96%)Rejected-AOC | L4 | Rejected-AOC Not Being lowest | |
| 5 | L5₹69.4 L+₹5.1 L (7.98%)Rejected-AOC | L5 | Rejected-AOC Not Being lowest |
| Sl No | Description | Qty | Unit | m/s raghavendra kulkarni L5 | Elite Constructions L4 | Siddivinayaka Constructions L1 | PRAGATHI BUILDERS L6 | M/S RADHIKA ENTERPRISES L3 | VP DEVELOPERS AND CONTRACTOR L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster of any description including racking out joints, hacking for key scrubbing down with water etc and removal of debris outside MoD land and depositing where directed. | 1,200 | Square Metre | 45 ₹54,000 | 24 ₹28,800 | 54 ₹64,800 | 60 ₹72,000 | 45 ₹54,000 | 15 ₹18,000 Lowest |
| 2.00 | Demolition of cement concrete (un-reinforced) as in sunken floors any thickness & in any description or in ground floor including removal of entire debris as ordered outside MD land complete all as directed. | 19 | Cubic Metre | 500 ₹9,500 | 600 ₹11,400 | 810 ₹15,390 | 700 ₹13,300 | 333 ₹6,327 | 300 ₹5,700 Lowest |
| 3.00 | Demolition of reinforced cement concrete as in roofs, floors (other than ground floors), beams, staircases, landing, chaj-jas and similar sus-pended work (reinforcement cut as required to facilitate demolition) including removing of debris as ordered outside MD land complete all as directed. | 2 | Cubic Metre | 900 ₹1,800 | 906 ₹1,812 | 900 ₹1,800 | 1,000 ₹2,000 | 333 ₹666 | 300 ₹600 Lowest |
| 4.00 | Demolition of brickwork , block masonry or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc and removal of debris as ordered outside MD land complete all as directed. | 0.5 | Cubic Metre | 500 ₹250 | 807 ₹403.5 | 900 ₹450 | 600 ₹300 | 333 ₹166.5 | 300 ₹150 Lowest |
| 5.00 | Taking down chowkats or frames not exc 1.5 sqm each with shutters (without taking off shutters from frame) and stacking at site where directed. | 76 | Each | 200 ₹15,200 | 141 ₹10,716 | 144 ₹10,944 | 200 ₹15,200 | 99 ₹7,524 Lowest | 160 ₹12,160 |
| 6.00 | All as per item 5 here-in-above but exceeding 1.5 Sqm but not exceeding 7.5 Sqm each | 72 | Each | 220 ₹15,840 | 420 ₹30,240 | 234 ₹16,848 | 220 ₹15,840 | 99 ₹7,128 Lowest | 160 ₹11,520 |
| 7.00 | Dismantling structural steel any type of steel including gates , purlins , rafters / roof coverings materials laid in walls excluding trusses complete all as specified and as directed. | 5.5 | Quintal | 1,200 ₹6,600 | 303 ₹1,666.5 | 450 ₹2,475 | 800 ₹4,400 | 45 ₹247.5 Lowest | 600 ₹3,300 |
| 8.00 | Dismantling floor, hearth or wall tiling inluding cement mortar bedding (but not backing), stacking serviceable tiles at site and removal of entire debris as ordered outside MD land complete all as directed. | 1,000 | Square Metre | 45 ₹45,000 | 42 ₹42,000 | 45 ₹45,000 | 80 ₹80,000 | 45 ₹45,000 | 30 ₹30,000 Lowest |
| 9.00 | Demolition of stone slabs and tiles of any description or thickness in floors, platform, aprons etc., laid, bedded and pointed in any mortar , stacking serviceable slbs at site and removal of entire debris as ordered outside MOD land complete all as directed. | 10 | Ten Square Metre | 750 ₹7,500 | 600 ₹6,000 | 270 ₹2,700 Lowest | 300 ₹3,000 | 360 ₹3,600 | 500 ₹5,000 |
| 10.00 | Excavation in trenches and not exe. 1.5 m wide and not exe. 1.5 m in depth for foundation of drain, man hole , laying of UG cables etc. not exe. 10 Sq. m on plan and not exe. 1.5 m depth and getting out in hard /dense soil complete all as specified and directed. | 35.1 | Cubic Metre | 350 ₹12,285 | 366 ₹12,846.6 | 450 ₹15,795 | 400 ₹14,040 | 270 ₹9,477 Lowest | 450 ₹15,795 |
Tender Value
₹72.7 L
EMD Value
₹1.3 L
Closing Date
11 Aug 2025, 6:00 pmClosed
GE CENTRAL BANGALORE
ASC CENTRA AND COLLEGE AGRAM POST BANGALORE 560007
SPECIAL REPAIRS TO BLDG NO P 08 QTR NO 01 TO 04 AT VOC UNDER GE CENTRAL BANGALORE
2025_MES_720434_1
8543E
Open Tender
Civil Works - Others
Item Rate
270 days
GE CENTRAL BANGALORE
Please refer tender documents
6 documents required · 6 mandatory
₹1,000
GE CENTRAL BANGALORE
₹1.3 L
Yes
18 Oct 2025
15 Jul 2025
13 Aug 2025
15 Jul 2025
11 Aug 2025
30 Jul 2025
15 Jul 2025 - 29 Jul 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .