Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.3 LAdmitted-Finance 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹30.3 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Blue Star Limited L1 |
|---|---|---|---|---|
| 1.00SUB HEAD-I for MSB Chiller plant | ||||
| 2.00Comprehensive maintenance including routine, preventive and break down maintenance of high side of the water cooled Airconditioning plant of capacity 3 x 110 TR comprising of all the machinery, equipment installed in the AC Plant room as per maintenance schedule attached at Annexure - H. N.B. :- Suitable recoveries to be made from the bill payable to the contractor for non-compliances as per stipulations given in the Annexure - R | ||||
| 3.00 | 1st year [1 job means per chiller unit per month] | 36 | Job | 6,48,755.46 ₹6,48,755.46 Lowest |
| 4.00 | 2nd year [1 job means per chiller unit per month] | 36 | Job | 6,48,755.46 ₹6,48,755.46 Lowest |
| 5.00SUB HEAD-2 for CSC Chiller plant | ||||
| 6.00Comprehensive maintenance including routine, preventive and break down maintenance of high side of the water cooled Air conditioning plant of capacity 2 x 110 TR comprising of all the machinery, equipment installed in the AC Plant room as per maintenance schedule attached at Annexure - H. N.B. :- Suitable recoveries to be made from the bill payable to the contractor for non-compliances as per stipulations given in the Annexure - R | ||||
| 7.00 | 1st year [1 job means per chiller unit per month] | 24 | Job | 4,32,503.64 ₹4,32,503.64 Lowest |
| 8.00 | 2nd year [1 job means per chiller unit per month] | 24 | Job | 4,32,503.64 ₹4,32,503.64 Lowest |
| 9.00SUB HEAD-3 for Bharti School Chiller plant | ||||
| 10.00Comprehensive maintenance including routine, preventive and break down maintenance of high side of the water cooled Air conditioning plant of capacity 1 x 100 TR & 1 x 110 TR comprising of all the machinery, equipment installed in the AC Plant room as per maintenance schedule attached at Annexure - H. N.B. :- Suitable recoveries to be made from the bill payable to the contractor for non-compliances as per stipulations given in the Annexure - R | ||||
Tender Value
₹30.3 L
EMD Value
₹60,581
Closing Date
14 May 2026, 3:00 pmClosed
Executive Engineer
Assistant Executive Engineer-in-charge, AC Division, Works Department, IIT Delhi, Hauz Khas, New Delhi - 110016
Comprehensive Maintenance of Chiller AC Plants (BLUE STAR OEM) of MSB, CSC and Bharti School, IIT Delhi (For Two Years)
2026_IIT_907023_1
IITD/WORKS (SP- 5294)/2025
Open Tender
Miscellaneous Works
Works
720 days
Indian Institute of Technology Delhi Hauz Khas
As per tender documents
14 documents required · 14 mandatory
₹0
₹60,581
27 May 2026
30 Apr 2026
15 May 2026
30 Apr 2026
14 May 2026
30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SUB HEAD-I for MSB Chiller plant | - | - | - | - |
| 2 | Comprehensive maintenance including routine, preventive and break down maintenance of high side of the water cooled Airconditioning plant of capacity 3 x 110 TR comprising of all the machinery, equipment installed in the AC Plant room as per maintenance schedule attached at Annexure - H. N.B. :- Suitable recoveries to be made from the bill payable to the contractor for non-compliances as per stipulations given in the Annexure - R | - | - | - | - |
| 3 | 1st year [1 job means per chiller unit per month] | 36 | Job | - | - |
| 4 | 2nd year [1 job means per chiller unit per month] | 36 | Job | - | - |
| 5 | SUB HEAD-2 for CSC Chiller plant | - | - | - | - |
| 6 | Comprehensive maintenance including routine, preventive and break down maintenance of high side of the water cooled Air conditioning plant of capacity 2 x 110 TR comprising of all the machinery, equipment installed in the AC Plant room as per maintenance schedule attached at Annexure - H. N.B. :- Suitable recoveries to be made from the bill payable to the contractor for non-compliances as per stipulations given in the Annexure - R | - | - | - | - |
| 7 | 1st year [1 job means per chiller unit per month] | 24 | Job | - | - |
| 8 | 2nd year [1 job means per chiller unit per month] | 24 | Job | - | - |
| 9 | SUB HEAD-3 for Bharti School Chiller plant | - | - | - | - |
| 10 | Comprehensive maintenance including routine, preventive and break down maintenance of high side of the water cooled Air conditioning plant of capacity 1 x 100 TR & 1 x 110 TR comprising of all the machinery, equipment installed in the AC Plant room as per maintenance schedule attached at Annexure - H. N.B. :- Suitable recoveries to be made from the bill payable to the contractor for non-compliances as per stipulations given in the Annexure - R | - | - | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_953360.xls
BOQ • 0.31 MB
5294.pdf
PDF • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .