Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹63.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹65.4 L+₹2.0 L (3.09%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹69.7 L+₹6.3 L (9.89%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹71.1 L+₹7.7 L (12.1%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹73.5 L+₹10.1 L (15.8%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
22 Sept 2026, 6:00 pmClosed
executive engineer IFC Div Sgr
BATAMALOO
Kut Khul Construction of RS Masonary Retaining wall on Right side US Shoragari Mohalla steel foot Bridge at RD 2 04 kms for a length of 71 mtrs
2026_IFC_323595_1
17
Open Tender
Civil Works
Percentage
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Executive Engineer Ifc Division Srinagar
₹2.3 L
29 Sept 2026
5 Sept 2026
24 Sept 2026
5 Sept 2026
22 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:
In cement mortar | 245.55 | cum | 1,740.45 | ₹4,27,367.5 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil | 1,281.6 | cum | 592.9 | ₹7,59,860.64 |
| 3 | Dumping stone excl. cost of stones in horizontal on level. | 206.6 | cum | 237.9 | ₹49,150.14 |
| 4 | Supply of stone boulders | 24.04 | cum | 700 | ₹16,828 |
| 5 | Supply of stones (Quarry) | 182.55 | cum | 1,175 | ₹2,14,496.25 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 32.66 | cum | 5,202.9 | ₹1,69,926.71 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3.23 | cum | 6,591.25 | ₹21,289.74 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 236.94 | cum | 7,788.4 | ₹18,45,383.5 |
| 9 | Centering & shuttering incl. strutting, propping etc. & removal of form work for:- Foundations, footings, bases for columns | 107.7 | sqm | 286.35 | ₹30,839.9 |
| 10 | Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered).
Depth exceeding 3 m but not exceeding 4.50 m | 323.1 | sqm | 281.3 | ₹90,888.03 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.47 MB
BOQ_1089662.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .