Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹96,220.21Admitted-Fee/PreQual/Technical/Finance | -7.00% | ₹96,220.21 | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.0 L
EMD Value
₹3,090
Closing Date
14 Sept 2026, 4:30 pmClosed
Executive Engineer Irrigation Division Anantnag
Office of the EXEN ID Anantnag
Restoration of breach by way of lining wall on Boan Ladi at RD 150mtrs
2026_IFC_322946_13
E-NIT No. 15 of 2026-27
Open Tender
Civil Works
Percentage
10 days
ID Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer Irrigation Division Anantnag
₹3,090
20 Sept 2026
1 Sept 2026
15 Sept 2026
1 Sept 2026
14 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 8.78 | Cum | 592.9 | ₹5,205.66 |
| 2 | Dumping stone including cost of stones. In Horizontal on level | 0.99 | Cum | 1,133.9 | ₹1,122.56 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.78 | Cum | 5,202.9 | ₹4,058.26 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 9.72 | Cum | 6,591.25 | ₹64,066.95 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 39 | Sqm | 286.35 | ₹11,167.65 |
| 6Carriage of materials from source upto Road site of work by M.T.and 555 mtrs H.L | |||||
| 6.1 | Cement by an average lead of 06 km. | 3.25 | M.T | 496.12 | ₹1,612.39 |
| 6.2 | Sand by an average lead of 24km. | 4.74 | cum | 1,135.36 | ₹5,381.61 |
| 6.3 | Stone aggregates 20mm by an average lead of 15km. | 8.78 | cum | 1,025.75 | ₹9,006.09 |
| 6.4 | Stone aggregates 40mm by an average lead of 15km. | 0.7 | cum | 1,110.96 | ₹777.67 |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_1085644.xls
BOQ • 0.27 MB
corrinit15.pdf
PDF • 1.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .