Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.6 LAccepted-AOC | ₹22.6 L Quoted ₹19.1 L | L1 | Accepted-AOC AS PER TENDER COMMITTEE RECOMMENDATION |
| 2 | L2₹19.8 L+₹68,915.89 (3.61%)Rejected-Finance | ₹19.8 L+₹68,915.89 (3.61%) | L2 | Rejected-Finance L2 bidder rejected |
| 3 | L3₹20.8 L+₹1.7 L (8.68%)Rejected-Finance | ₹20.8 L+₹1.7 L (8.68%) | L3 | Rejected-Finance L3 bidder rejected |
| 4 | L4₹21.4 L+₹2.3 L (12.1%)Rejected-Finance CL JAMBAD COLLIERY PO BAHULA BARDHAMAN 713322 WEST BENGAL INDIA | BAHULA | PASCHIM BARDHAMAN | WEST BENGAL | 713322 | ₹21.4 L+₹2.3 L (12.1%) | L4 | Rejected-Finance L4 bidder rejected |
Tender Value
₹23.8 L
EMD Value
₹29,900
Closing Date
12 Feb 2026, 10:00 amClosed
Office of the Asst.Manager(Survey) Kenda Area
Office of the General Manager Kenda Area Survey Department PO Haripur Dist Burdwan West Bengal 713378
Construction R C C protective roofing at pit bottom of shaft no 4 shaft no 6 and shaft no7 in Dobrana RV seam of Lower Kenda Colliery under Kenda Area ECL
2026_ECL_351996_1
ECL/Knd/Sur/e-Ten/25-26/38 date 28.01.2026
Open Tender
Civil Works - Others
Percentage
120 days
Lower kenda colliery under Kenda Area ECL
Please refer Tender documents
4 documents required · 4 mandatory
₹29,900
21 Aug 2026
2 Feb 2026
13 Feb 2026
2 Feb 2026
12 Feb 2026
3 Feb 2026
2 Feb 2026 - 5 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item Description/ Heading | - | - | - | - |
| 2 | Cleaning of work site | - | cum | 614.79 | - |
| 3 | Recess cutting in floor through stone | - | cum | 6,811.29 | - |
| 4 | For side locking wall recess cutting in coal(b) for locking of beam support | - | cum | 2,430.28 | - |
| 5 | R.C.C work 1:2:4 for wall side, roof,beem | 1 | cum | 6,714.98 | ₹6,708.27 |
| 6 | roof bolting instone in floor | - | Nos | 482.41 | - |
| 7 | roof bolting in coal for side | - | Nos | 241.21 | - |
| 8 | centering and shuttering | 1 | Sq.m | 1,913.07 | ₹1,911.16 |
| 9 | Loading and unloading materials at S/F and U/G | - | Nos | 514.3 | - |
| 10 | Materials cost(Chips) | - | cum | 2,200 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.20 MB
Tendernotice_2.pdf
PDF • 0.69 MB
BOQ_364795.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .