| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.7 L+₹51,448 (43.6%)Rejected-AOC 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Withdrawn |
| Sl No | Description | Qty | Unit | S S AND CO L2 | DHARSHINI ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Providing Barricading works for laying cables using Steel barricade with green barricade Construction safety nets continuously without gap inclusive material cost,labour charges and removal charges after completing the work etc complete and as directed by the Engineer at site | 20 | M2 | 425 ₹8,500 | 350 ₹7,000 Lowest |
| 2.00 | Removing the blacktopping of any thickness for forming cable trench and cable duct at road crossing 60cm wide and 150 cm deep (clear) including cost of providing sign boards, danger lights, indication arrangements wherever necesssary, lead, lift labour and tools and plants etc., complete. | 4 | M3 | 2,200 ₹8,800 Lowest | 2,500 ₹10,000 |
| 3.00 | Dismantling of the existing brick work transformer gantry including cost of all materials, lead, lift, labour charges, etc., complete as per standard specification and as directed by the department engineer at site. | 5 | M3 | 725 ₹3,625 | 600 ₹3,000 Lowest |
| 4.00 | Dismantling the brick work PCC inside the cable trench and cable duct wherever occur of any thickenss and clearing the trench/duct free from debris and without hindrance to the cable laying work including led, lift, labour, tools & plants etc., completed as per direction of Engineer-in-charge | 5 | M3 | 875 ₹4,375 Lowest | 1,000 ₹5,000 |
| 5.00 | Dismantling the brick work RCC inside the cable trench and cable duct wherever occur of any thickenss and clearing the trench/duct free from debris and without hindrance to the cable laying work including led, lift, labour, tools & plants etc., completed as per direction of Engineer-in-charge | 2 | M3 | 6,225 ₹12,450 | 6,000 ₹12,000 Lowest |
| 6.00 | Earth work excavation in all soils including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct at road crossing including cost of providing sign boards, danger lights, indication arrangements wherever necessary and providing shoring and strutting arrangements wherever necessary, all lead, lift, labour, tools & plants, etc., compete. | 110 | M3 | 975 ₹1,07,250 Lowest | 1,100 ₹1,21,000 |
| 7.00 | Providing and laying of 160mm dia PVC pipes shall be jointed with necessary accessories such as elbows, bends, for road crossing including of all materials, required for lead, lift, labour etc complete | 40 | RM | 1,200 ₹48,000 | 1,010 ₹40,400 Lowest |
| 8.00 | Providing and laying of 110mm dia PVC/HDPE pipes shall be jointed with necessary accessories such as elbows, bends, for road crossing including of all materials, required for lead, lift, labour etc complete | 15 | RM | 690 ₹10,350 Lowest | 750 ₹11,250 |
| 9.00 | Layng of P:C:C 1:2:4 using 20mm HBG metal including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. | 2 | M3 | 12,000 ₹24,000 | 10,500 ₹21,000 Lowest |
| 10.00 | Filling with filling Sand in layers well rammed, watered and compacted as per standard specification including cost of all materials, lead, labour, etc., complete. | 31 | M3 | 1,125 ₹34,875 | 850 ₹26,350 Lowest |
Tender Value
Refer Docs
EMD Value
₹5,820
Closing Date
7 Jul 2025, 2:00 pmClosed
SE/GCC-II/CNI
Superintending Engineer,GCC II,230 KV CMRL GIS SS,Alandur,chennai-16
As per NIT
2025_EB_572174_1
OT-21/2025-26 of GCC-II
Open Tender
Civil Works
Works
120 days
DLF
Please refer tender specification
2 documents required · 2 mandatory
₹0
₹5,820
Yes
10 Sept 2025
21 Jun 2025
8 Jul 2025
21 Jun 2025
7 Jul 2025
21 Jun 2025
Amount
Providing Barricading works for laying cables using Steel barricade with green barricade Construction safety nets continuously without gap inclusive material cost,labour charges and removal charges after completing the work etc complete and as directed by the Engineer at site
Removing the blacktopping of any thickness for forming cable trench and cable duct at road crossing 60cm wide and 150 cm deep (clear) including cost of providing sign boards, danger lights, indication arrangements wherever necesssary, lead, lift labour and tools and plants etc., complete.
Dismantling of the existing brick work transformer gantry including cost of all materials, lead, lift, labour charges, etc., complete as per standard specification and as directed by the department engineer at site.
Dismantling the brick work PCC inside the cable trench and cable duct wherever occur of any thickenss and clearing the trench/duct free from debris and without hindrance to the cable laying work including led, lift, labour, tools & plants etc., completed as per direction of Engineer-in-charge
Dismantling the brick work RCC inside the cable trench and cable duct wherever occur of any thickenss and clearing the trench/duct free from debris and without hindrance to the cable laying work including led, lift, labour, tools & plants etc., completed as per direction of Engineer-in-charge
Earth work excavation in all soils including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct at road crossing including cost of providing sign boards, danger lights, indication arrangements wherever necessary and providing shoring and strutting arrangements wherever necessary, all lead, lift, labour, tools & plants, etc., compete.
Providing and laying of 160mm dia PVC pipes shall be jointed with necessary accessories such as elbows, bends, for road crossing including of all materials, required for lead, lift, labour etc complete
Providing and laying of 110mm dia PVC/HDPE pipes shall be jointed with necessary accessories such as elbows, bends, for road crossing including of all materials, required for lead, lift, labour etc complete
Layng of P:C:C 1:2:4 using 20mm HBG metal including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site.
Filling with filling Sand in layers well rammed, watered and compacted as per standard specification including cost of all materials, lead, labour, etc., complete.
Supplying and Laying RCC cover slab of size 600x500x50mm including labour for loading, unloading, stenciling and placing in position carefully as required at site, cost of slab, all labour, lead, lift, T&P, etc., complete.
Refilling with excavated earth in layers well consolidated as per standard specification including cost of all filling, lead, lift, labour for filling well ramming consoliodation etc, complete
Transporting and clearing the excess excavated earth and debris than and there and as soon as immediately to avoid any hinderance to normal flow of traffic and publicf beyond a distance of 5km from the work spot as per the direction of Engineer at site including loading and unloading charges etc., complete.
Brick work in C M 1:6 using good quality secound class chamber burnt bricks including cost of all materials labour, lead & lift etc., complete as directed by the department at site.
Plastering in CM 1:5 12 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site .
Supplying, fabricating and fixing in position of G.I.Angles/Channels/Plates at inside cable duct including cost of steel and other required materials such as G.I.clamps, screws, labour charges, transportation and fixing, chipping in BM/RCC and finishing it neatly, etc., complete and as directed by the Engineer at site.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
S S AND CO (BID ID -1393162)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .