Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Technical | -23.00% | ₹1.8 L | L1 | Admitted-Technical Responsive |
| 2 | L2₹1.9 L+₹4,561.13 (2.47%)Admitted-Technical | -21.10% | ₹1.9 L+₹4,561.13 (2.47%) | L2 | Admitted-Technical Responsive |
| 3 | L3₹2.0 L+₹14,403.58 (7.79%)Admitted-Technical | -17.00% | ₹2.0 L+₹14,403.58 (7.79%) | L3 | Admitted-Technical Responsive |
| 4 | L4₹2.0 L+₹15,363.82 (8.31%)Admitted-Technical | -16.60% | ₹2.0 L+₹15,363.82 (8.31%) | L4 | Admitted-Technical Responsive |
Tender Value
₹2.4 L
EMD Value
₹4,800
Closing Date
2 Jun 2026, 4:00 pmClosed
Executive Engineer rnb division Awantipora
Executive Engineer rnb division Awantipora
Construction of P Bund along the road near H/o Ghulam Mohammad Bhat (Touth) at Awantipora Phase-1
2026_PWDJK_310495_1
18/EEA/RNB of 2026-27/1332-42 Dated 21-05-2026
Open Tender
Civil Works
Percentage
30 days
AWANTIPORA
as per NIT
5 documents required · 5 mandatory
₹200
Executive Engineer rnb division Awantipora
₹4,800
4 Jun 2026
21 May 2026
3 Jun 2026
21 May 2026
2 Jun 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Retaining wall. | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | - | Cum | - | - |
| 3 | Providing and laying of stone soling (dully hand packed) including watering dressing and ramming with all carriages loading un-loading and stacking etc complete. | - | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size | - | Cum | 1 | - |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1 | Cum | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc | - | sqm | - | - |
| 7 | Carriage of materials by Mechanical Transport from Source to site of work. | - | - | - | - |
| 8 | Stone Agg for an average of 5 kms. | - | Cum | - | - |
| 9 | Sand for an average of 5 kms. | 1 | Cum | - | - |
| 10 | Providing and fixing of citizen information Board (sign board) fabricated of angle iron including writing, painting and Photographs complete job. | - | Job | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
finance_1004381.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_1004381.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .