Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-Finance | ₹2.5 Cr | L1 | Accepted-Finance Lowest |
| 2 | L2₹2.6 CrRejected-Finance | ₹2.6 Cr | L2 | Rejected-Finance 2nd Lowest |
| 3 | Rejected-Technical VILLAGE BASTI KOHALA P O ADHE DI HATTI TEHSIL JAWALAMUKHI DISTRICT KANGRA H P | KANGRA | HIMACHAL PRADESH | 176001 | - | - | Rejected-Technical Significant mismatch between Turnover Certificate records for the year 2024-2025 17194070/- and the report of downloaded UDIN NO.25503310BMIJFC6233 was mismatched, resolve discrepancy for further processing not Completed. Hence, rejected |
Updated dates
Tender Value
Refer Docs
EMD Value
₹4.9 L
Closing Date
21 Apr 2026, 5:00 pmClosed
Executive Engineer Division Kasumpti HPPWD Shimla
Executive Engineer Division Kasumpti HPPWD Shimla-3
Building portion WS and SI Rain water harvesting tank, Septic tank and stie DEveopment etc
2026_PWD_133918_2
SD-I-CTR-Tender-2026- 601 dated 09-04-26
Open Tender
Civil Works
540 days
Shimla
As per SBD
15 documents required · 15 mandatory
₹7,000
₹4.9 L
6 Jun 2026
10 Apr 2026
22 Apr 2026
10 Apr 2026
21 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cutting and disposal of earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site., according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ).All the surplus excavated earth to be dumped at dumping site(dumping sites will be arranged by the contractor on his own cost). Any loss to the public and private propriety, human being, machinery during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.The rate is including octroi, royality,Malkana, toll texes imposed by the Government but excluding GST. | |||||
Earth work in excavation for structure in all depths as per drawing and technical specification for rural roads August 2004 clause 305.1 including setting out, construction of shoring abd bracing, removal of stumps and other deleterious materials and disposal in all leads and lift including dressing of sides and bottom and back filling in trenches with excavated suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where balsting is prohibited) all earth work in cutting/ excavation including rock excavation shall be carried out true to lines grades, side slopes, width , camber super elevation and level as shown on the drawings or as directed by the Engineer-in-charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified dimension or as directed by the Engineer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other causes it shall be remove by suitable diversion bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. All the surplus excavated earth to be dumped at dumping site(dumping sites will be arranged by the contractor on his own cost).Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be dully compensated by him at his on cost in all cases. including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.The rate is including octroi, royality,Malkana, toll texes imposed by the Government but excluding GST. | - | Per Cubic Metre | - | - | |
Supply and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete including carriage of materials in all leads and lifts as per the directions of the Engineer-in-Charge.The rate is including octroi, royality,Malkana, toll texes imposed by the Government but excluding GST. | - | Per Cubic Metre | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete complete including carriage of material in all leads and lifts as per direction of the Engineer in Charge.The rate is including octroi, royality,Malkana, toll texes imposed by the Government but excluding GST. | - | Per square metre | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.The rate is including octroi, royality,Malkana, toll texes imposed by the Government but excluding GST. | - | Per square metre | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform upto all floor levels complete including carriage of material in all leads and lifts as per direction of the Engineer in Charge.The rate is including octroi, royality,Malkana, toll texes imposed by the Government but excluding GST. | - | Per square metre | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts Circular upto all floor levels complete ncluding carriage of material in all leads and lifts as per direction of the Engineer - in - Charge.The rate is including octroi, royality,Malkana, toll texes imposed by the Government but excluding GST. | - | Per square metre | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers upto all floor levels complete ncluding carriage of material in all leads and lifts as per direction of the Engineer - in - Charge.The rate is including octroi, royality,Malkana, toll texes imposed by the Government but excluding GST. | - | Per square metre | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for : Stairs, (excluding landings) except spiral stair cases upto all floor levels complete ncluding carriage of material in all leads and lifts as per direction of the Engineer - in - Charge.The rate is including octroi, royality,Malkana, toll texes imposed by the Government but excluding GST. | - | Per square metre | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for : Edges of slabs and breaks in floors and walls Under 20 cm wide upto all floor levels complete including carriage of material in all leads and lifts as per direction of the Engineer in Charge.The rate is including octroi, royality,Malkana, toll texes imposed by the Government but excluding GST. | - | Per running metre | - | - | |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.24 MB
SBD24450492.pdf
Tender Documents • 10.78 MB
BOQ_197995.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid